Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Des Moines International Airport
Provide custodial services.
Posted Date
-
Due Date
Jul 1, 2026
Des Moines International Airport
Close: Jul 1, 2026
Provide custodial services.
AvailableDes Moines International Airport
Work includes : relocation of the gas service the A and C concourse, relocation of the fire pump electrical feeder originating at the big claim substation and relocation of an existing generator load bank from bldg. 3. See outside link.
Posted Date
-
Due Date
May 5, 2026
Des Moines International Airport
Close: May 5, 2026
Work includes : relocation of the gas service the A and C concourse, relocation of the fire pump electrical feeder originating at the big claim substation and relocation of an existing generator load bank from bldg. 3. See outside link.
Des Moines International Airport
Work includes : construction and expansion of the phase 1A PCC apron pavement installed in 2026, new PCC taxiline connecting the new phase 1A apron pavement to the existing apron pavement to the southwest, and complete construction of the taxiway G connector taxiway between taxiway P and the new phase 1A apron. See outside link.
Posted Date
Apr 3, 2026
Due Date
Apr 30, 2026
Release: Apr 3, 2026
Des Moines International Airport
Close: Apr 30, 2026
Work includes : construction and expansion of the phase 1A PCC apron pavement installed in 2026, new PCC taxiline connecting the new phase 1A apron pavement to the existing apron pavement to the southwest, and complete construction of the taxiway G connector taxiway between taxiway P and the new phase 1A apron. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge