Discover Opportunities months before the RFP drops
Learn more →Replace Building 118 FCUs. Upgrade the HVAC system in B118 (Engineering Building). The existing HVAC system in B118 is two-pipe hydronic glycol heating units located in the maintenance shop and corridors, while the office spaces use an overhead Daikin VRF for both heating and cooling as well as baseboard supplemental hot water heating.
Posted Date
Dec 12, 2025
Due Date
Feb 4, 2026
Release: Dec 12, 2025
Close: Feb 4, 2026
Replace Building 118 FCUs. Upgrade the HVAC system in B118 (Engineering Building). The existing HVAC system in B118 is two-pipe hydronic glycol heating units located in the maintenance shop and corridors, while the office spaces use an overhead Daikin VRF for both heating and cooling as well as baseboard supplemental hot water heating.
AvailableReplace ER AHU Brooklyn Campus. Provide all necessary labor and material to complete the Replacement and refurbishing of the HVAC equipment includes the replacement of the packaged AHU, refurbishing and upgrade the exhaust fans, replacement of the reheat system entirely, Heat exchanger, Pumps, CV boxes and piping in accordance with the attached manufacturer specifications and the VA specifications. This work shall include but is not limited to all necessary labor and Material to perform all Mechanical, electrical, Plumbing and other related trade work for a complete restoration and functional system. Provide and install all new digital control wiring system interlocked with the exhaust system, the space temperature and the Honeywell front end. Exhaust Fans Refurbish existing exhaust fans, EF1 at 15,270 CFM, EF2 at 1040 CFM, and EF3 at 1335 CFM, replace existing motors with equal HP and RPM, Install new fabric & sealant on the ductwork seams. See attached file.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Replace ER AHU Brooklyn Campus. Provide all necessary labor and material to complete the Replacement and refurbishing of the HVAC equipment includes the replacement of the packaged AHU, refurbishing and upgrade the exhaust fans, replacement of the reheat system entirely, Heat exchanger, Pumps, CV boxes and piping in accordance with the attached manufacturer specifications and the VA specifications. This work shall include but is not limited to all necessary labor and Material to perform all Mechanical, electrical, Plumbing and other related trade work for a complete restoration and functional system. Provide and install all new digital control wiring system interlocked with the exhaust system, the space temperature and the Honeywell front end. Exhaust Fans Refurbish existing exhaust fans, EF1 at 15,270 CFM, EF2 at 1040 CFM, and EF3 at 1335 CFM, replace existing motors with equal HP and RPM, Install new fabric & sealant on the ductwork seams. See attached file.
AvailableProvide Upgrade NFS Elevator S-7. Upgrade S7 Canteen Kitchen Elevator,
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Provide Upgrade NFS Elevator S-7. Upgrade S7 Canteen Kitchen Elevator,
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis