Sources Sought Notice for Project Labor Aggreements (PLAs) To Coastal Storm Risk Management (CSRM)
Posted
Oct 18, 2026
Nov 2, 2026
Work for the beachfill placement dredging will require a hopper and pipeline/mechanical dredge(s). The dredge(s) must have the capability to dredge material up to a depth of -40 ft NAVD88 and to transport the dredged sand to the designated areas approximately 2.6 miles away. The contract work will consist of a base bid to conduct pre-placement condition surveys and pump/place 600,000 cubic yards of sand from two borrow areas approximately 2.6 miles south of the Cape May Inlet jetties onto the beach at 2 locations: Area 1 (540,000 cu yds), the US Coast Guard Training Center and Area 2 (60,000 cu yds). See attached file.