Discover Opportunities months before the RFP drops
Learn more →The Crow Nation is seeking a minimum of two qualified contractors to submit their qualifications for an Indefinite Delivery, Indefinite Quantity (IDIQ) construction contract. This contract will have an initial term of 3 years, with the option to extend up to 2 additional years. The scope of work includes various construction services for the Crow Irrigation Project. Job order contracts (JOC) will be issued on a project-by-project basis. The Crow Nation intends to award this contract based on an evaluation of the performance metrics and criteria provided. See outside link.
Posted Date
Jul 9, 2025
Due Date
Aug 8, 2025
Release: Jul 9, 2025
Close: Aug 8, 2025
The Crow Nation is seeking a minimum of two qualified contractors to submit their qualifications for an Indefinite Delivery, Indefinite Quantity (IDIQ) construction contract. This contract will have an initial term of 3 years, with the option to extend up to 2 additional years. The scope of work includes various construction services for the Crow Irrigation Project. Job order contracts (JOC) will be issued on a project-by-project basis. The Crow Nation intends to award this contract based on an evaluation of the performance metrics and criteria provided. See outside link.
Schedule 1 - sewer main replacement: replacement of approx., 8,400 LF of sewer main and associated appurtenances and schedule 2 - lift station: installation of a new east frontage road lift station and associated appurtenances. Bids are requested for the following contract: phase 3C wastewater collection system improvements.
Posted Date
May 9, 2025
Due Date
Jun 10, 2025
Release: May 9, 2025
Close: Jun 10, 2025
Schedule 1 - sewer main replacement: replacement of approx., 8,400 LF of sewer main and associated appurtenances and schedule 2 - lift station: installation of a new east frontage road lift station and associated appurtenances. Bids are requested for the following contract: phase 3C wastewater collection system improvements.
Project consists of RCP, the construction of a steel reinforced concrete structure associated with footings, walls, wall extensions and floor slabs. The construction will include earthwork, such as excavation, demolition of existing structures, clearing/grubbing, structure site preparation, compaction requirements, reshaping/backfilling, and restoration of the canal prism. Other work includes the furnishing and installation of miscellaneous metal (grating, gate guides and all other miscellaneous metal), furnishing and installation of slide gates and reclamation (seeding, fertilizing and mulching).
Posted Date
Mar 28, 2025
Due Date
Apr 23, 2025
Release: Mar 28, 2025
Close: Apr 23, 2025
Project consists of RCP, the construction of a steel reinforced concrete structure associated with footings, walls, wall extensions and floor slabs. The construction will include earthwork, such as excavation, demolition of existing structures, clearing/grubbing, structure site preparation, compaction requirements, reshaping/backfilling, and restoration of the canal prism. Other work includes the furnishing and installation of miscellaneous metal (grating, gate guides and all other miscellaneous metal), furnishing and installation of slide gates and reclamation (seeding, fertilizing and mulching).
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis