Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Cranston Housing Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Cranston Housing Authority
Remove and properly disposal of solid waste, including household trash and recyclables and office/commercial trash and recyclables.
Posted Date
Sep 29, 2025
Due Date
Oct 23, 2025
Release: Sep 29, 2025
Cranston Housing Authority
Close: Oct 23, 2025
Remove and properly disposal of solid waste, including household trash and recyclables and office/commercial trash and recyclables.
Cranston Housing Authority
Selective demolition, abatement and general construction for the scope of work identified as interior renovations at. The scope of work in general is (but not limited to) the removal and disposal of existing flooring systems, acoustical ceiling tile systems, light fixtures and scrape, sand and prepare all railings, walls and doors. Install new luxury vinyl flooring systems, acoustical ceiling tile systems, light fixtures and paint all walls, railings and doors as specified and described on the drawing provided.
Posted Date
Sep 19, 2025
Due Date
Oct 16, 2025
Release: Sep 19, 2025
Cranston Housing Authority
Close: Oct 16, 2025
Selective demolition, abatement and general construction for the scope of work identified as interior renovations at. The scope of work in general is (but not limited to) the removal and disposal of existing flooring systems, acoustical ceiling tile systems, light fixtures and scrape, sand and prepare all railings, walls and doors. Install new luxury vinyl flooring systems, acoustical ceiling tile systems, light fixtures and paint all walls, railings and doors as specified and described on the drawing provided.
Cranston Housing Authority
The scope of work in general is to provide brick, pre-cast and cast-in-place concrete cleaning, repairing, and replacement, as well as waterproofing the brick, pre-cast and cast-in-place; removal and replacement of joint materials as occurs and as indicated.
Posted Date
Jan 20, 2025
Due Date
Feb 6, 2025
Release: Jan 20, 2025
Cranston Housing Authority
Close: Feb 6, 2025
The scope of work in general is to provide brick, pre-cast and cast-in-place concrete cleaning, repairing, and replacement, as well as waterproofing the brick, pre-cast and cast-in-place; removal and replacement of joint materials as occurs and as indicated.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.