Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Crane Union High School
Constructing water and wastewater system improvements including furnishing and installing submersible pumps and pitless adapters in two wells; constructing a new well pump station including booster pumps; constructing a new wastewater lift station; constructing approx. 2.65 acres of wastewater lagoons and evaporative ponds including earthwork, lining of the lagoons and evaporative ponds, piping, and control structures; installing approx. 950' of 4" polyvinyl Chloride water line, 820' of 8" gravity sewer, and approx. 1,160' of 2" high density polyethylene pressure pipe; installing electrical, controls, and instrumentation; monitoring and telemetry work; fencing; and painting; together with all other work required to complete the project and specified herein.
Posted Date
Mar 13, 2026
Due Date
Apr 7, 2026
Release: Mar 13, 2026
Crane Union High School
Close: Apr 7, 2026
Constructing water and wastewater system improvements including furnishing and installing submersible pumps and pitless adapters in two wells; constructing a new well pump station including booster pumps; constructing a new wastewater lift station; constructing approx. 2.65 acres of wastewater lagoons and evaporative ponds including earthwork, lining of the lagoons and evaporative ponds, piping, and control structures; installing approx. 950' of 4" polyvinyl Chloride water line, 820' of 8" gravity sewer, and approx. 1,160' of 2" high density polyethylene pressure pipe; installing electrical, controls, and instrumentation; monitoring and telemetry work; fencing; and painting; together with all other work required to complete the project and specified herein.
AvailableCrane Union High School
Project is an approx 3500 SF, steel framed addition to the existing elementary school gymnasium. Stem wall & footing foundation, concrete slab-on-grade floor, 110 foot x 32 foot metal building (previously purchased), turn key office, hallway, classrooms and restroom additions w/ fire suppressant, heating/cooling, etc and sidewalk from front of multi-purpose room to connect to back of current elementary sidewalk.
Posted Date
Jun 4, 2025
Due Date
Jun 11, 2025
Release: Jun 4, 2025
Crane Union High School
Close: Jun 11, 2025
Project is an approx 3500 SF, steel framed addition to the existing elementary school gymnasium. Stem wall & footing foundation, concrete slab-on-grade floor, 110 foot x 32 foot metal building (previously purchased), turn key office, hallway, classrooms and restroom additions w/ fire suppressant, heating/cooling, etc and sidewalk from front of multi-purpose room to connect to back of current elementary sidewalk.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Crane Union High School's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database