Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Costco Wholesale
New 161,562 SF warehouse building on one level. Warehouse is a pre-engineered metal building with masonry unit, metal siding, and textured metal paneled walls, metal roof system, and concrete slab on grade. This project includes a 16 island fuel facility. Sitework is by the developer. Please note that proposals need to have the fuel facility pricing provide separately from the warehouse. Fuel Facility scope includes canopy foundations, canopy slab, tank slab, fuel piping, fuel electrical, painting of miscellaneous steel components, and bollard protection.
Posted Date
May 28, 2026
Due Date
Jul 23, 2026
Release: May 28, 2026
Costco Wholesale
Close: Jul 23, 2026
New 161,562 SF warehouse building on one level. Warehouse is a pre-engineered metal building with masonry unit, metal siding, and textured metal paneled walls, metal roof system, and concrete slab on grade. This project includes a 16 island fuel facility. Sitework is by the developer. Please note that proposals need to have the fuel facility pricing provide separately from the warehouse. Fuel Facility scope includes canopy foundations, canopy slab, tank slab, fuel piping, fuel electrical, painting of miscellaneous steel components, and bollard protection.
AvailableCostco Wholesale
Building: the work includes but is not limited to, building shell, canopies, interior tenant improvements, and finishes. The work also includes, but not limited to, interior signage, fire protection, sprinkler systems, life safety/fire sprinkler systems, life safety/fire management systems, plumbing and electrical/lighting systems. On site: the work includes, but not limited to, site demolition, abatement if required, excavation, import fill, grading, storm water drainage system with detention/retention vaults/ponds, water distribution systems, sanitary sewer systems natural gas distribution system, electrical, dry utilities/distribution systems, site lighting, curbes, pavement, striping/arrows, landscaping, irrigation, fencing.
Posted Date
Jun 24, 2026
Due Date
Jul 10, 2026
Release: Jun 24, 2026
Costco Wholesale
Close: Jul 10, 2026
Building: the work includes but is not limited to, building shell, canopies, interior tenant improvements, and finishes. The work also includes, but not limited to, interior signage, fire protection, sprinkler systems, life safety/fire sprinkler systems, life safety/fire management systems, plumbing and electrical/lighting systems. On site: the work includes, but not limited to, site demolition, abatement if required, excavation, import fill, grading, storm water drainage system with detention/retention vaults/ponds, water distribution systems, sanitary sewer systems natural gas distribution system, electrical, dry utilities/distribution systems, site lighting, curbes, pavement, striping/arrows, landscaping, irrigation, fencing.
Costco Wholesale
Work includes an addition and remodel to the existing warehouse. Project consists of a tenant improvement with a total addition of 3,240 SF to the receiving area and 1,600 SF exterior mechanical room. Which includes the addition of a new expanded loading dock, receiving area and additional sales floor area as well as the remodel of existing bakery, meat prep, rotisserie, and coolers. On site: the work includes, but not limited to, demolition, excavation, import fill, grading, storm water drainage system water distribution systems, sanitary sewer systems, natural gas distribution system, electrical distribution systems, curbes, pavement, striping/arrows, landscaping, irrigation, fencing.
Posted Date
May 20, 2026
Due Date
Jun 12, 2026
Release: May 20, 2026
Costco Wholesale
Close: Jun 12, 2026
Work includes an addition and remodel to the existing warehouse. Project consists of a tenant improvement with a total addition of 3,240 SF to the receiving area and 1,600 SF exterior mechanical room. Which includes the addition of a new expanded loading dock, receiving area and additional sales floor area as well as the remodel of existing bakery, meat prep, rotisserie, and coolers. On site: the work includes, but not limited to, demolition, excavation, import fill, grading, storm water drainage system water distribution systems, sanitary sewer systems, natural gas distribution system, electrical distribution systems, curbes, pavement, striping/arrows, landscaping, irrigation, fencing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge