Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Coos Bay North Bend Water Board
The upgrades will consist of the removal and disposal of an existing automatic transfer switch, propane generator, above ground propane tank, and concrete pads. New construction will consist of new concrete generator pad, diesel-powered generator, automatic transfer switch, and associated electrical upgrades. Work also includes all temporary structures and control facilities to maintain a continuous pump station, all specified delivery acceptance tests and inspections, installed tests and inspections, and operational testing and commissioning.
Posted Date
Feb 13, 2026
Due Date
Mar 11, 2026
Release: Feb 13, 2026
Coos Bay North Bend Water Board
Close: Mar 11, 2026
The upgrades will consist of the removal and disposal of an existing automatic transfer switch, propane generator, above ground propane tank, and concrete pads. New construction will consist of new concrete generator pad, diesel-powered generator, automatic transfer switch, and associated electrical upgrades. Work also includes all temporary structures and control facilities to maintain a continuous pump station, all specified delivery acceptance tests and inspections, installed tests and inspections, and operational testing and commissioning.
AvailableCoos Bay North Bend Water Board
Work includes approx. 1,624 LF of 10" Ductile Iron water main., 829 LF of 8" Ductile Iron water main, 161 LF of 6" Ductile Iron water main, 464 LF of 8" PVC water main and 1,681 LF of 6" PVC water main including appurtenances, and short lengths of various diameter for final tie-ins to existing mains, and all service line connections and hydrant relocations.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Coos Bay North Bend Water Board
Close: Jan 8, 2026
Work includes approx. 1,624 LF of 10" Ductile Iron water main., 829 LF of 8" Ductile Iron water main, 161 LF of 6" Ductile Iron water main, 464 LF of 8" PVC water main and 1,681 LF of 6" PVC water main including appurtenances, and short lengths of various diameter for final tie-ins to existing mains, and all service line connections and hydrant relocations.
Coos Bay North Bend Water Board
Installation of approx., 230 LF of 36" steel casing pipe within the existing tunnel. Removing debris and prepare tunnel for installation of approx., 230 CY of control density fill (class E backfill).
Posted Date
-
Due Date
Dec 17, 2025
Coos Bay North Bend Water Board
Close: Dec 17, 2025
Installation of approx., 230 LF of 36" steel casing pipe within the existing tunnel. Removing debris and prepare tunnel for installation of approx., 230 CY of control density fill (class E backfill).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Coos Bay North Bend Water Board
The Regular Board Meeting focused primarily on the award of bids for several major procurements. Key discussions included the proposed award of water treatment chemical bids for the 2026 calendar year, resulting in unanimous approval to award contracts to the lowest responsible bidders despite some price increases. The Board also approved the purchase of a new stream and current monitor (SCM) to replace an aging unit, opting for the Chemtrac HA2-DT4 model to ensure near-instantaneous readings and improved process control. Furthermore, the Board accepted the lowest bid of $999,752.00 from SLE, Inc. for the FY 2025 water main replacement bundle, and awarded the Pony Creek discharge line tunnel project to Papaya Contracting, LLC for $157,362.00 after a review of qualifications. Updates were provided on the HVAC replacement at the Water Treatment Plant and the outreach plan for the FY25-26 Water Rate Analysis.
The Board meeting included an update on the High-level Reservoir roof replacement project, which was successfully completed on schedule and within budget. The replacement covered approximately 10,000 square feet, utilizing galvanized steel trusses. The Board also discussed the results of the FY2025 Water Rates & System Development Charges (SDC) analysis. Following deliberation on balancing financial sustainability with affordability, the Board unanimously adopted Rate Design Option 5B, which features gradual and predictable increases. The Board directed the General Manager to proceed with implementation planning. Updates were also provided regarding the scheduled HVAC replacement for the Water Treatment Plant. The session concluded with an executive session to discuss potential litigation.
The Budget Committee meeting of the Coos Bay-North Bend Water Board covered several key areas, including a review of the proposed budget for Fiscal Year 2025-26. Discussions included budget projections, a proposed 8% water rate adjustment to address labor costs, inflationary increases, and capital project funding. Long-range planning, early results from a water rate study, operations and maintenance expenses, current and anticipated debt, and the capital improvement program were also reviewed. The committee also discussed the Water System Master Plan, which estimates a total capital need of approximately $122.8 million over the next 20 years, and a cost-of-service analysis to examine how water rates are distributed among different customer classes. The meeting also included updates on the Source of Supply budget and operations, power and pumping optimization, treatment plant operations, field customer services, customer service and data processing, distribution and transmission, administrative and general sections, fixed assets, and engineering section.
The Coos Bay-North Bend Water Board convened to discuss several key issues. A presentation was given by the Confederated Tribes of Coos, Lower Umpqua, and Siuslaw Indians (CTCLUSI) regarding a right-of-way request across watershed property, which was later denied. The board approved Task Order No. 34 with Dyer Partnership for engineering services related to installing fall-protection davit arm systems at the Pony Creek Water Treatment Plant. They also approved the purchase of a 72" Scag Turf Tiger II zero-turn mower from Horner's Inc. Additionally, the board discussed the FY2025 Water Rates & System Development Charges (SDC) analysis results and received updates on the High-level Roof Replacement, the new Ford Explorer, and the 11th Court Water main Replacement.
The meeting included a presentation of the FY2025 financial audit findings by Clear Trail CPAs, which issued an unmodified opinion. A corrective action plan was presented to address a dating error identified in the audit. FCS Consulting Group presented an analysis of water rates and system development charges, outlining several rate structure scenarios. Updates were provided on the meter change out/AMR installation project and the Brights Mill Pump Station improvements. The design phase of the tunnel repair project has been completed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Coos Bay North Bend Water Board's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Coos Bay North Bend Water Board's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database