Public Utility District No. 1 Of Skagit County Pre-Bid Meeting Minutes
The meeting provided an overview of the Alger Well Replacement Project, focusing on the construction of a new source well to replace the existing, undersized well for the Alger Water System. Key discussions included the technical requirements for drilling, such as using cable-tool methods to reach a depth of 300 feet, the installation of flow-control and surface seals due to flowing aquifer conditions, and coordination with PUD operations to minimize service disruptions. The project schedule for bids and addenda was reviewed, alongside logistical considerations like site access, security, debris management, and water testing procedures.
