Board Of Public Works Regular Board Meeting
The meeting began with the Pledge of Allegiance and a moment of silence. Key discussions focused on personnel changes, with a current employee moving to an Area Manager role in Elton, Maryland, and Matt Davis being promoted to Project Manager in Lewis. Public comment was reserved for the beginning of the meeting. Significant operational updates included ongoing issues with the gate for Train 4 due to vendor non-responsiveness, which might necessitate switching to a more expensive stainless steel option. The Neo Water trial transition is complete, pending bulk delivery. Maintenance and corrective activities involved installing a new mixer in the EQ tank, swapping membranes between trains 3 and 4, and addressing recurring failures at Pump Station 17 due to ragging (specifically flushable wipes), resulting in high rebuild costs for the outdated 1984 pumps, leading to a discussion about eliminating the station. Issues with a compactor due to a proprietary PLC/programming problem requiring a JWC technician were detailed. Turbidity levels at UF1 were noted as high since October, requiring investigation, possibly calibration. A work order clarification noted that 'sand cleaning' was a typo for 'cleaning' the membranes. The failure of check valves at Pump Station 6 (Connecticut Avenue) requires a specialized truck to prevent overflow during pump swapping. A chemical piping leak (hypo) was reported at the process building. Finally, an exhaust fan at Lewis had a power/programming issue, allowing manual operation only.
