Board Of Water Commissioners Meeting Minutes
The board discussed ongoing hydrant flushing operations and the initiation of seasonal landscaping. A significant portion of the meeting focused on a proposed large-scale solar field and storage facility on Oakham Road, with the board noting concerns about its proximity to the local water supply and the lack of proper notification to the department as a direct abutter. The superintendent presented cost estimates for water infrastructure upgrades on Elm Street, with the board recommending a multi-year phased approach. Additionally, the board reviewed the aftermath of a water main break caused by a subcontractor, noting that the paving contractor would be responsible for the repair costs.