Fayetteville Public Works Commission seeks a vendor to furnish and deliver a complete structures-and-equipment package for the POD 5 – McArthur Road 230 kV/69 kV substation, including structural steel, tubular structures, bus and conductor materials, switches, insulators, connectors, grounding materials, instrument transformers, station service transformers, surge arresters and related hardware listed in the technical specifications and bill of materials. The substation design is centered on 230 kV high-side and 69 kV low-side systems with two 230/66 kV autotransformers and includes detailed structural, fabrication, grounding and installation requirements. Bidders must submit the required technical documentation and pricing on the provided Attachment B Bid Pricing Form and comply with the IFB instructions, submittal checklist and the Sale of Goods Agreement terms.
The commission addressed several key business items, including the declaration of surplus personal property such as transformers and capacitors for sale by sealed bid. Discussions included approval of an interlocal agreement for solar facility use of municipal property and the authorization of a sole source purchase agreement for water meters, chambers, and components. The commission reviewed the annual audit report for the 2026 fiscal year and received updates on financial status, capital investments, and debt position. Additional business included awarding a contract for steel poles for a utility tap line and receiving reports on uncollectible accounts, utility payments, and recent actions by the City Council. The meeting concluded after an executive session held for legal matters.
Enterprise
Get verified public-sector contacts at scale
Find verified emails, direct dials, role context, job-change updates, and organization signals across every public-sector account you sell to.
Purchase of seven relay control switchboards, one termination cabinet, one battery panel (owner to furnish HyCap batteries), loose-ship materials, accessories, and spare components to support protection, control, metering, communications, and SCADA functions at the POD 5 McArthur Road Substation. The selected supplier must furnish, assemble, wire, test, document, and deliver the equipment in accordance with the technical specifications and issued-for-bid drawings. Installation in the substation control house is excluded from the supplier's scope and will be performed by others.
Oct 28, 2026
·
Board meeting agenda packet
Fayetteville Public Works Commission Meeting
The Commission addressed several items including the declaration of personal property as surplus and authorization for its sale by sealed bid. Discussions also covered the approval of a construction award recommendation for transmission steel pole replacements, the approval of an electric construction sole source purchase for Ethernet switches and software, and the adoption of an Allowable Costs and Costs Principles Policy for grant-funded projects. Additionally, financial updates, general manager reports, and liaison comments were provided.
Oct 14, 2026·Board meeting agenda packet
Fayetteville Public Works Commission Meeting
The Commission addressed several key business items, including the adoption of budget ordinances for cybersecurity improvements, economic development assistance, and transmission pole replacements. The Board also reviewed and approved awards for an annual underground distribution boring contract and the purchase of galvanized steel transmission poles. Reports and discussions included an update on the Granular Activated Carbon (GAC) system project, customer service and call center metrics, financial reports, bad debt, and investment summaries. Additionally, the Commission declared certain overhead transformers as surplus and authorized their sale by sealed bid.
Sep 23, 2026·Board meeting agenda packet
Fayetteville Public Works Commission Meeting Agenda And Minutes
The Commission addressed the approval of a design-build contract for the Battery Energy Storage System at Sally Hill. Key discussion topics included an update on the comprehensive leak detection program, which identified significant water loss savings and documented infrastructure maintenance needs. The Commission reviewed several financial resolutions regarding the acceptance of state loan offers for water treatment facility expansions and approved budget amendments for both electric and water/wastewater funds. Additionally, the General Manager's report highlighted internal safety initiatives, workforce recognition, and updated operational strategies regarding water resource management and severe weather preparedness.