Discover Opportunities months before the RFP drops
Learn more →The Community College of Aurora (CCA) is soliciting qualifications from architectural, engineering, and planning firms to develop a comprehensive Facilities Master Plan for its CentreTech (owned), Lowry (leased), and Centennial (leased) campuses. The FMP must comply with the State of Colorado Office of the State Architect Master Plan Submittal Guidelines and align with Colorado Department of Higher Education policies; it will drive CCA’s State Five-Year Capital Construction Plan and inform future Design/Bid/Build projects. Key procurement milestones include a mandatory pre-submittal conference on 2026-01-07 and qualifications due on 2026-01-23; firms must meet minimum experience requirements and preference will be given to Colorado resident vendors and labor.
Posted Date
Dec 9, 2025
Due Date
Jan 23, 2026
Release: Dec 9, 2025
Close: Jan 23, 2026
The Community College of Aurora (CCA) is soliciting qualifications from architectural, engineering, and planning firms to develop a comprehensive Facilities Master Plan for its CentreTech (owned), Lowry (leased), and Centennial (leased) campuses. The FMP must comply with the State of Colorado Office of the State Architect Master Plan Submittal Guidelines and align with Colorado Department of Higher Education policies; it will drive CCA’s State Five-Year Capital Construction Plan and inform future Design/Bid/Build projects. Key procurement milestones include a mandatory pre-submittal conference on 2026-01-07 and qualifications due on 2026-01-23; firms must meet minimum experience requirements and preference will be given to Colorado resident vendors and labor.
AvailableThe State of Colorado (through the Office of the State Architect and the State Buildings Program) issued a Notice of Final Settlement for the Community College of Auroraâs Upgrade Access and Accessibility project (Project No. 2023-051M22), summarizing work performed by Hausmann Construction Inc. The notice sets the final settlement date and requires any person or entity with unpaid claims against the project to file a verified claim prior to final settlement to preserve rights. The listing is a Notice of Contractor Settlement (NCS1) for the CCA Upgrade Access project and is not a grant opportunity.
Posted Date
Dec 5, 2025
Due Date
Dec 19, 2025
Release: Dec 5, 2025
Close: Dec 19, 2025
The State of Colorado (through the Office of the State Architect and the State Buildings Program) issued a Notice of Final Settlement for the Community College of Auroraâs Upgrade Access and Accessibility project (Project No. 2023-051M22), summarizing work performed by Hausmann Construction Inc. The notice sets the final settlement date and requires any person or entity with unpaid claims against the project to file a verified claim prior to final settlement to preserve rights. The listing is a Notice of Contractor Settlement (NCS1) for the CCA Upgrade Access project and is not a grant opportunity.
AvailableWork consists of fiber link installation and legacy cable decommissioning. Includes, cable removal: complete demolition and cleanup of legacy coaxial and telecom systems, starting from the main closet and extending to all associated rooms. All cabling and related infrastructure must be fully removed from the closet to the rooms. Fiber patch panel: installation of a new enclosure to house both existing and new fiber connections, located adjacent to the demarcation closet. Fiber link: install a new 42-strand single-mode fiber link between room a107g and room a201k. The total length of the fiber run is approximately 140 feet. This installation should include all necessary components to interconnect both. Install low-voltage cat6 cabling from room a107g to room a201k, totaling 12 ethernet runs, each approximately 140 feet in length.
Posted Date
Nov 5, 2025
Due Date
Nov 12, 2025
Release: Nov 5, 2025
Close: Nov 12, 2025
Work consists of fiber link installation and legacy cable decommissioning. Includes, cable removal: complete demolition and cleanup of legacy coaxial and telecom systems, starting from the main closet and extending to all associated rooms. All cabling and related infrastructure must be fully removed from the closet to the rooms. Fiber patch panel: installation of a new enclosure to house both existing and new fiber connections, located adjacent to the demarcation closet. Fiber link: install a new 42-strand single-mode fiber link between room a107g and room a201k. The total length of the fiber run is approximately 140 feet. This installation should include all necessary components to interconnect both. Install low-voltage cat6 cabling from room a107g to room a201k, totaling 12 ethernet runs, each approximately 140 feet in length.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis