Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Cogan House Township
Provide and place approx 3,300 GAL asphalt joint and crack seal.
Posted Date
Jul 24, 2026
Due Date
Aug 4, 2026
Release: Jul 24, 2026
Cogan House Township
Close: Aug 4, 2026
Provide and place approx 3,300 GAL asphalt joint and crack seal.
AvailableCogan House Township
Work includes 493 SY geotextile, class 4, type a; 493 SY superpave asphalt mixture design, base course, pg 64s-22, <0.3 million esals, 25.0 mm mix, 4" depth; 493 sy subbase 6" depth (no.2a); 17 ton subbase (no. 2a); 493 SY superpave asphalt mixture design, wearing course, pg 64s-22, <0. 3 million esals, 9.5mm mix, 1 1/2" depth, srl-l; 493 SY asphalt tack coat( ntt/cntt); 137.5 LF type 31-s guide rail; 1 EA type 31-strong post end treatment; 1 LS construction surveying, type d, modified; 1 LS 128" x 83" corrugated aluminized steel pipe arch, type ii (3"x1" corrugations), 12 gage. See attached file.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Cogan House Township
Close: Dec 2, 2025
Work includes 493 SY geotextile, class 4, type a; 493 SY superpave asphalt mixture design, base course, pg 64s-22, <0.3 million esals, 25.0 mm mix, 4" depth; 493 sy subbase 6" depth (no.2a); 17 ton subbase (no. 2a); 493 SY superpave asphalt mixture design, wearing course, pg 64s-22, <0. 3 million esals, 9.5mm mix, 1 1/2" depth, srl-l; 493 SY asphalt tack coat( ntt/cntt); 137.5 LF type 31-s guide rail; 1 EA type 31-strong post end treatment; 1 LS construction surveying, type d, modified; 1 LS 128" x 83" corrugated aluminized steel pipe arch, type ii (3"x1" corrugations), 12 gage. See attached file.
Cogan House Township
Approx 250 +/- Ton AASHTO #3 Screened Limestone (PA#3A); 100 +/- Ton AASHTO #1 Limestone (pa#4); 1,000 +/- Ton 2A Subbase; 500 +/- Ton R-6; 500 +/- Ton R-8; 2,000 +/- Ton DSA; 200 +/- Ton TSA; 1,000 +/- Ton Anti Skid;
Posted Date
Feb 14, 2025
Due Date
Mar 4, 2025
Release: Feb 14, 2025
Cogan House Township
Close: Mar 4, 2025
Approx 250 +/- Ton AASHTO #3 Screened Limestone (PA#3A); 100 +/- Ton AASHTO #1 Limestone (pa#4); 1,000 +/- Ton 2A Subbase; 500 +/- Ton R-6; 500 +/- Ton R-8; 2,000 +/- Ton DSA; 200 +/- Ton TSA; 1,000 +/- Ton Anti Skid;
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Cogan House Township
The board discussed public concerns regarding ATV usage on township roads, noting liability and road damage risks. Bid openings and awards occurred for dust retardants and aggregate stone for the upcoming year. Correspondence from PennDOT regarding bridge replacement detours and training invitations was reviewed. Additionally, the board approved a landscaping quote for spring maintenance and authorized a donation from the general fund to the recreation committee.
The meeting addressed various township operations and business matters. Key discussion topics included correspondence regarding liquid fuels funding, bridge detour routing, and a proposal for a new communication tower. The board reviewed a road report regarding ongoing drainage projects and road conditions. New business focused on pavilion rental requests, a proposal to allow ATV use on specific township roads which was tabled due to liability concerns, and the authorization to advertise bids for aggregate stone, dust retardant, and contractor services. Additionally, the board reviewed permit requirements for a pipe replacement project and received notifications regarding oil and gas liquid waste storage and industrial water usage.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Cogan House Township's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge