Discover Opportunities months before the RFP drops
Learn more →Provide services for the replacement of remote terminal unit (rtu) control panels at the east water purification plant (ewpp) pressure reduction station (prs) and the southeast water purification plant (sewpp) prs. Provide fabrication, programming, configuration, and integration of a new RTU Panel to replace the existing GEM80 and HSQ panels at EWPP PRS. This includes any new conduits and wiring needed for integration of the new RTU panel. Existing process instrumentation and I/O will remain.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Close: Dec 19, 2025
Provide services for the replacement of remote terminal unit (rtu) control panels at the east water purification plant (ewpp) pressure reduction station (prs) and the southeast water purification plant (sewpp) prs. Provide fabrication, programming, configuration, and integration of a new RTU Panel to replace the existing GEM80 and HSQ panels at EWPP PRS. This includes any new conduits and wiring needed for integration of the new RTU panel. Existing process instrumentation and I/O will remain.
AvailableProvide qualified subcontractors and material suppliers for the supply, installation, and commissioning of additional vertical diffusion vane pumping units and associated medium voltage synchronous motors. The pump station project involves furnishing and installing: four (4) raw water pumps (PMP-301, PMP-303, PMP-305, PMP-307) meeting section 11140 requirements, including pump, motor, pedestal, sub-base, anchor bolts, and appurtenances; four (4) medium voltage synchronous motors meeting section 16225 requirements, including all coordination with pumps, installation, and testing; motor access platform; new discharge piping for each pump, large diameter valves and hydraulic actuators. See attached file.
Posted Date
Aug 26, 2025
Due Date
Sep 26, 2025
Release: Aug 26, 2025
Close: Sep 26, 2025
Provide qualified subcontractors and material suppliers for the supply, installation, and commissioning of additional vertical diffusion vane pumping units and associated medium voltage synchronous motors. The pump station project involves furnishing and installing: four (4) raw water pumps (PMP-301, PMP-303, PMP-305, PMP-307) meeting section 11140 requirements, including pump, motor, pedestal, sub-base, anchor bolts, and appurtenances; four (4) medium voltage synchronous motors meeting section 16225 requirements, including all coordination with pumps, installation, and testing; motor access platform; new discharge piping for each pump, large diameter valves and hydraulic actuators. See attached file.
Recondition one 700 hp reliance electric limited motor (p-3) used on industrial size water pumps. Work includes furnishing labor, equipment, and materials to remove, transport motor to and from contractor's facility, recondition test per cwa specifications, and re-install.
Posted Date
Aug 15, 2025
Due Date
Sep 2, 2025
Release: Aug 15, 2025
Close: Sep 2, 2025
Recondition one 700 hp reliance electric limited motor (p-3) used on industrial size water pumps. Work includes furnishing labor, equipment, and materials to remove, transport motor to and from contractor's facility, recondition test per cwa specifications, and re-install.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis