The Project includes selective demolition to the main lobby space. Upgrades will include new entry doors and ballistic rated interior doors, access controls, security and transaction windows. Electrical work will be required for the access controls and some ceiling and wall repairs as necessary.
Selective demolition to the main lobby space. Upgrades will include new entry doors and ballistic rated interior doors, access controls, security and transaction windows. Electrical work will be required for the access controls and some ceiling and wall repairs as necessary.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Clarksburg
County
The county where this buyer is located.
Harrison
Address
Physical address of this buyer.
1001 South Chestnut Street
Zip Code
Postal code for this buyer's location.
26301
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Clarksburg Water Board
CWB Board Board Meeting
Date: Nov 12, 2026Type: Meeting mention
The board meeting included discussions on the monthly chemical cost report and vendor reports, noting a significant reduction in water loss due to the identification and repair of leaks. Approval was granted for catering quotes for an employee Christmas luncheon. Updates were provided on ongoing infrastructure projects, including status reports on various water line contracts, progress on tank installations, and upcoming phase completions. The board also approved several requisitions for project payments related to water line replacements and design services, and discussed security enhancement plans for the facility.
CWB Board Board Meeting
Date: Oct 28, 2026Type: Meeting mention
The board discussed the status of various water system projects, including pump and tank installations across different phases. A report on unaccounted-for water loss was reviewed, along with ongoing investigations to trace and repair leaks. The board evaluated unaudited financial statements for the fiscal year ending June 30, 2026, noting the positive impact of recent rate adjustments. Authorization was granted for an emergency contract with City Window and Construction Company to perform repairs on the building following structural damage. Additionally, the general manager provided updates on water line installations and paving activities.
Key Contacts
Public-sector contacts connected to Clarksburg Water Board.
The board discussed public concerns regarding the burial of power lines for a water tank project, reviewed monthly chemical cost reports and vendor history reports, and approved the purchase of fire hydrants. Additionally, the meeting included progress updates on water system improvement projects, focusing on Phase 3A trench repairs, paving, and line installations, as well as planning statuses for Phase 3B.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Clarksburg Water Board meetings, strategic plans, and budget discussions before the public bid appears.