Learn more →The site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
Posted Date
Dec 15, 2025
Due Date
Jan 8, 2026
Release: Dec 15, 2025
Close: Jan 8, 2026
The site development including and installation of a new water tower. Work includes approx. 1 LS 3,000,000 Gal composite elevated water storage tank, 20 CY additional concrete for footings, 20 CY additional excavation, 1 LS clearing & grubbing, 85 CY aggregate base, 18 Gal non-tracking tack coat, 640 FT fence, 53 SF 5" concrete sidewalk, 50 LF 4" conduit storm repair, 225 LF 6" PVC SDR-35 sanitary sewer,242 LF 16" water main, 1 EA 16" butterfly valve, 1 EA 6" fire hydrant, 4,250 SY seeding & mulching, 5,000 EA erosion control, 1 Allow SCADA system.
AvailableThe Project includes replacing up to 10 fire hydrants assemblies (6 as part of the base bid and 4 alternatives) throughout the city, including restoration of the area around the replaced hydrants.
Posted Date
Aug 7, 2025
Due Date
Aug 21, 2025
Release: Aug 7, 2025
Close: Aug 21, 2025
The Project includes replacing up to 10 fire hydrants assemblies (6 as part of the base bid and 4 alternatives) throughout the city, including restoration of the area around the replaced hydrants.
The work consists of installation of new water main and connections. Further includes 1 LS clearing and grubbing; 50' curb removed; 1 EA valve box removed; 22 CY asphalt concrete base, pg64-22; 104 CY aggregate base; 12 gal non-tracking tack coat, 0.06 gal/s. Y; 11 CY 2" asphalt concrete surface course, type 1; 10' fence replaced in-kind (chainlink); 50' curb and gutter replaced (in-kind); 200' 4" conduit, type b, 707. 45, storm repair; 200' 6" conduit, type b, 707. 45, storm repair; 25' 10" conduit, type c, 706. 02, storm repair; 25' 10" conduit, type c, 707. 33, storm repair. See outside link.
Posted Date
Mar 13, 2025
Due Date
Apr 3, 2025
Release: Mar 13, 2025
Close: Apr 3, 2025
The work consists of installation of new water main and connections. Further includes 1 LS clearing and grubbing; 50' curb removed; 1 EA valve box removed; 22 CY asphalt concrete base, pg64-22; 104 CY aggregate base; 12 gal non-tracking tack coat, 0.06 gal/s. Y; 11 CY 2" asphalt concrete surface course, type 1; 10' fence replaced in-kind (chainlink); 50' curb and gutter replaced (in-kind); 200' 4" conduit, type b, 707. 45, storm repair; 200' 6" conduit, type b, 707. 45, storm repair; 25' 10" conduit, type c, 706. 02, storm repair; 25' 10" conduit, type c, 707. 33, storm repair. See outside link.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis