Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Van
Project consists of constructing necessary site work to level site for test hole and production water well drilling activities, drilling a water well test hole to evaluate subsurface characteristics and geological formations at the site, drilling a production water well to the limits determined by the Owner and Engineer in alignment with the test hole logs, installation of a vertical turbine water well pump and motor in the finished water well construction, and plugging and abandoning the existing water well that this facility will replace. See attached file.
Posted Date
-
Due Date
Apr 30, 2026
City of Van
Close: Apr 30, 2026
Project consists of constructing necessary site work to level site for test hole and production water well drilling activities, drilling a water well test hole to evaluate subsurface characteristics and geological formations at the site, drilling a production water well to the limits determined by the Owner and Engineer in alignment with the test hole logs, installation of a vertical turbine water well pump and motor in the finished water well construction, and plugging and abandoning the existing water well that this facility will replace. See attached file.
AvailableCity of Van
Work includes 6 ea. 4' dia. Concrete manhole removal and replacement includes excavation, bypass pumping, removal & disposal, fittings, bedding, grading, compaction, backfilling, surface restoration.
Posted Date
Jun 29, 2024
Due Date
Jul 22, 2024
Release: Jun 29, 2024
City of Van
Close: Jul 22, 2024
Work includes 6 ea. 4' dia. Concrete manhole removal and replacement includes excavation, bypass pumping, removal & disposal, fittings, bedding, grading, compaction, backfilling, surface restoration.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: If sale is less than ~$50,000, use sole source.
Coops: Lead with cooperative purchasing through the city’s existing memberships; validate your product is on a coop and proceed to avoid a formal bid. If coops aren’t feasible: Prepare for a formal public competitive bid.
There is no documented sole source pathway for City of Van. Deprioritize this route and redirect efforts to cooperative contracts.
Board meetings and strategic plans from City of Van
This comprehensive plan for the City of Van, Texas, provides policies and a design framework for resilient growth. It is guided by principles emphasizing respect for nature, public spaces, walkability, local agriculture, and community self-improvement. The plan establishes seven Quality of Life Areas and ten policy statements covering nature, urban design, transportation, housing, economic development, infrastructure, public services, education, health care, and human development. The overarching goal is to maintain Van as a vibrant community of neighborhoods with a central downtown, foster local job growth, and enhance its role as a regional economic center.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Van's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database