Discover Opportunities months before the RFP drops
Learn more →The project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The project includes the rehabilitation of existing sanitary sewer lines through pipe bursting methods, replacement of sanitary sewer service laterals, and rehabilitation of sewer manholes. Work includes, 175 SY of pavement repair (hmac type d) 2" & flowable; 120 LF of trench excavation safety protection; 665 LF of sewer main television inspection (8" - 15"); 665 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting; 1,120 LF of sewer main television inspection (8" - 15"); 1,120 LF of install 8" dr17 ips hdpe san. Sewer pipe, method pipe bursting. See attached files.
AvailableProject includes the following golf course components: renovation of all sand bunkers, installation of new golf course irrigation sprinkler heads and two-wire control wire with controller and software, leveling and sodding of all tees, select pruning and thinning of trees and underbrush, and replacement of some areas of concrete cart path.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Close: Dec 16, 2025
Project includes the following golf course components: renovation of all sand bunkers, installation of new golf course irrigation sprinkler heads and two-wire control wire with controller and software, leveling and sodding of all tees, select pruning and thinning of trees and underbrush, and replacement of some areas of concrete cart path.
AvailableWork includes approx 142 CY flowable fill; 1,000 LF trench excavation safety protection; 1,000 LF 8" PVC waterline; 15 EA 3/4" relay long service. See attached file.
Posted Date
Jul 9, 2025
Due Date
Jul 22, 2025
Release: Jul 9, 2025
Close: Jul 22, 2025
Work includes approx 142 CY flowable fill; 1,000 LF trench excavation safety protection; 1,000 LF 8" PVC waterline; 15 EA 3/4" relay long service. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis