City fleet maintenance program.
The project consists of sandblasting and painting of steel appurtenances on four final clarifier tanks at the waste water treatment plant.
Posted Date
Oct 29, 2025
Due Date
Nov 19, 2025
Release: Oct 29, 2025
Close: Nov 19, 2025
The project consists of sandblasting and painting of steel appurtenances on four final clarifier tanks at the waste water treatment plant.
Work includes 2121 CY excavation; 608 SF concrete walk; 608 SF curb ramp; 395 CY topsoil, 4"; 3552 SY seeding and mulching, class 2; 8 MSF mowing; 15000 EA erosion control; 11 EA catch basin, no. 3; 4 EA manhole, no. 3; 3 EA manhole, adjusted to grade; 493 CY asphalt concrete base; 1143 CY aggregate base; 444 gal tack coat; 166 CY asphalt concrete, surface course; 25 LF 6" water main ductile iron pipe; 1 EA 6" gate valve; 144 gal tack coat; 50 CY asphalt concrete, surface course; 77 CY asphalt concrete, intermediate course; 189 LF crosswalk line.
Posted Date
Sep 11, 2025
Due Date
Oct 1, 2025
Release: Sep 11, 2025
Close: Oct 1, 2025
Work includes 2121 CY excavation; 608 SF concrete walk; 608 SF curb ramp; 395 CY topsoil, 4"; 3552 SY seeding and mulching, class 2; 8 MSF mowing; 15000 EA erosion control; 11 EA catch basin, no. 3; 4 EA manhole, no. 3; 3 EA manhole, adjusted to grade; 493 CY asphalt concrete base; 1143 CY aggregate base; 444 gal tack coat; 166 CY asphalt concrete, surface course; 25 LF 6" water main ductile iron pipe; 1 EA 6" gate valve; 144 gal tack coat; 50 CY asphalt concrete, surface course; 77 CY asphalt concrete, intermediate course; 189 LF crosswalk line.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis