Discover Opportunities months before the RFP drops
Learn more →1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Close: Jan 6, 2026
1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
AvailableThe project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 27,000 SY remove bituminous pavement 10,200 LF remove and replace concrete curb and gutter 2,900 LF remove storm sewer pipe 5,390 LF remove sanitary sewer pipe 5,380 LF remove watermain pipe 9,650 CY excavation common (p) 9,850 CY excavation subgrade (p) 1 ls excavation rock 1,000 CY common embankment (CV) 4,850 ton type SP 9. 5 wearing course mix (3,c) 2,300 ton type SP 12. 5 non wear course mix (3,c) 36,600 SF 3" bituminous walk 5,650 LF 8" 10" PVC sanitary sewer 4,040 LF 15" 36" RCP storm sewer 6,870 LF 4" 8" dip watermain.
Posted Date
Mar 23, 2025
Due Date
May 12, 2025
Release: Mar 23, 2025
Close: May 12, 2025
The project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 27,000 SY remove bituminous pavement 10,200 LF remove and replace concrete curb and gutter 2,900 LF remove storm sewer pipe 5,390 LF remove sanitary sewer pipe 5,380 LF remove watermain pipe 9,650 CY excavation common (p) 9,850 CY excavation subgrade (p) 1 ls excavation rock 1,000 CY common embankment (CV) 4,850 ton type SP 9. 5 wearing course mix (3,c) 2,300 ton type SP 12. 5 non wear course mix (3,c) 36,600 SF 3" bituminous walk 5,650 LF 8" 10" PVC sanitary sewer 4,040 LF 15" 36" RCP storm sewer 6,870 LF 4" 8" dip watermain.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis