Discover Opportunities months before the RFP drops
Learn more →Install 208 LF 24" RCP, 24" FES, and grate inlets. Work shall also include filling 24" CMP with flowable fill, grading, silt fence, inlet protection, removing and replacing asphalt, traffic control, and grassing.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
Install 208 LF 24" RCP, 24" FES, and grate inlets. Work shall also include filling 24" CMP with flowable fill, grading, silt fence, inlet protection, removing and replacing asphalt, traffic control, and grassing.
AvailableThe City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The City of Springfield, Georgia is soliciting sealed bids for construction of drainage improvements along West Fourth Street. The project includes installation of approximately 208 LF of 24-inch RCP with an end section and grate inlets, abandonment of 24-inch CMP with flowable fill, and associated grading, erosion control, asphalt removal/replacement, traffic control, and grassing. Bids are due at City Hall, 130 S. Laurel St, Springfield, GA 31329, with plans/specs available from Parker Engineering (Statesboro, GA) for purchase.
AvailableThe selected firm will be expected to provide certified wastewater operators, maintain all required licenses and certifications, and ensure reliable and compliant performance of the City's 0.6 MGD extended aeration treatment facility.
Posted Date
Oct 10, 2025
Due Date
Nov 14, 2025
Release: Oct 10, 2025
Close: Nov 14, 2025
The selected firm will be expected to provide certified wastewater operators, maintain all required licenses and certifications, and ensure reliable and compliant performance of the City's 0.6 MGD extended aeration treatment facility.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis