Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Sheboygan Falls
Constructing full replacement of Lead service lines from the connection point in the dwelling to the water main in the street. full replacement of sanitary laterals from the connection point in the dwelling to the water main in the street. restoring areas disturbed by construction to original condition or as specified by contract documents. replacement of sidewalk curb ramps. surface milling of the existing asphalt pavement. installation of a new upper layer of asphalt pavement. provide traffic control for public and access for contractors equipment. obtaining all permits for construction of work not obtained by engineer or owner.
Posted Date
Apr 11, 2026
Due Date
Apr 28, 2026
Release: Apr 11, 2026
City of Sheboygan Falls
Close: Apr 28, 2026
Constructing full replacement of Lead service lines from the connection point in the dwelling to the water main in the street. full replacement of sanitary laterals from the connection point in the dwelling to the water main in the street. restoring areas disturbed by construction to original condition or as specified by contract documents. replacement of sidewalk curb ramps. surface milling of the existing asphalt pavement. installation of a new upper layer of asphalt pavement. provide traffic control for public and access for contractors equipment. obtaining all permits for construction of work not obtained by engineer or owner.
AvailableCity of Sheboygan Falls
The resurfacing will consist of approx. 20,221 SY of asphaltic pulverizing, 4,821 Tons of hot mix asphaltic pavement and miscellaneous concrete curb/gutter removal & replacement.
Posted Date
May 24, 2024
Due Date
Jun 12, 2024
Release: May 24, 2024
City of Sheboygan Falls
Close: Jun 12, 2024
The resurfacing will consist of approx. 20,221 SY of asphaltic pulverizing, 4,821 Tons of hot mix asphaltic pavement and miscellaneous concrete curb/gutter removal & replacement.
City of Sheboygan Falls
Work includes removal of the existing asphalt overlayed concrete, excavation below subgrade, grading, base aggregate, storm water, curb and gutter, sidewalk, asphalt pavement, and landscape restoration. Water system improvements will consist of replacement of the existing 10-inch water main with a new 12-inch water main and public and private side lead service replacement. Public and private side sanitary laterals will be replaced.
Posted Date
Jan 10, 2025
Due Date
Jan 28, 2025
Release: Jan 10, 2025
City of Sheboygan Falls
Close: Jan 28, 2025
Work includes removal of the existing asphalt overlayed concrete, excavation below subgrade, grading, base aggregate, storm water, curb and gutter, sidewalk, asphalt pavement, and landscape restoration. Water system improvements will consist of replacement of the existing 10-inch water main with a new 12-inch water main and public and private side lead service replacement. Public and private side sanitary laterals will be replaced.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: Ask about using State of Wisconsin contracts or Sourcewell to speed procurement; if allowed, buy through a familiar reseller (e.g., CDW-G or SHI).
City of Sheboygan Falls shows no evidence of using sole source. The city adheres to formal competitive bidding for purchases over $25,000.
Track City of Sheboygan Falls's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database