Learn more →This Invitation for Bid (IFB) solicits sealed bids to remove barriers and construct two ADA-compliant entrances and remodel two restrooms at the Market Street Senior Center in Santa Cruz. The work includes demolition, concrete work, installation of new mechanical, electrical, and plumbing infrastructure, and compliance with applicable accessibility codes and the City's specifications. Bids are sealed and due via the Citys e-Procurement portal by January 20, 2026; project duration is 40 working days.
Posted Date
Dec 8, 2025
Due Date
Jan 20, 2026
Release: Dec 8, 2025
Close: Jan 20, 2026
This Invitation for Bid (IFB) solicits sealed bids to remove barriers and construct two ADA-compliant entrances and remodel two restrooms at the Market Street Senior Center in Santa Cruz. The work includes demolition, concrete work, installation of new mechanical, electrical, and plumbing infrastructure, and compliance with applicable accessibility codes and the City's specifications. Bids are sealed and due via the Citys e-Procurement portal by January 20, 2026; project duration is 40 working days.
AvailableProcurement for the conversion of an existing drinking water production well at Beltz 8 into an aquifer storage and recovery (ASR) facility, including demolition, mechanical, piping, electrical, instrumentation, and control system modifications, and installation of new yard piping and downhole control valves.
Posted Date
-
Due Date
Jan 9, 2026
Close: Jan 9, 2026
Procurement for the conversion of an existing drinking water production well at Beltz 8 into an aquifer storage and recovery (ASR) facility, including demolition, mechanical, piping, electrical, instrumentation, and control system modifications, and installation of new yard piping and downhole control valves.
AvailableWork includes 325 SF ada concrete; 1 LS structural work - materials; 55 LF framing - interior; 2 EA doors - exterior; 3 EA doors - interior; 1 LS drywall; 600 SF tile; 1 LS paint; 1 LS bath partitions; 8 EA plumbing; 2 EA HVAC - exhaust fans; 1 LS electrical.
Posted Date
Dec 8, 2025
Due Date
Jan 20, 2026
Release: Dec 8, 2025
Close: Jan 20, 2026
Work includes 325 SF ada concrete; 1 LS structural work - materials; 55 LF framing - interior; 2 EA doors - exterior; 3 EA doors - interior; 1 LS drywall; 600 SF tile; 1 LS paint; 1 LS bath partitions; 8 EA plumbing; 2 EA HVAC - exhaust fans; 1 LS electrical.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis