Discover Opportunities months before the RFP drops
Learn more →Release: Nov 6, 2025
Close: Dec 18, 2025
Parking garage & downtown signage.
AvailableWork consists of lift station decommission, installation of a sanitary sewer line and connection to existing stub out. Work includes, 140 LF of install, maintain & remove 8" biodegradable erosion control log; 45 SY of furnishing & placing top soil (2"); 45 Sy of sodding; 130 LF of remove existing chain-link fence; 30 LF of remove & replace 8' wood fence;
Posted Date
Jul 30, 2025
Due Date
Aug 20, 2025
Release: Jul 30, 2025
Close: Aug 20, 2025
Work consists of lift station decommission, installation of a sanitary sewer line and connection to existing stub out. Work includes, 140 LF of install, maintain & remove 8" biodegradable erosion control log; 45 SY of furnishing & placing top soil (2"); 45 Sy of sodding; 130 LF of remove existing chain-link fence; 30 LF of remove & replace 8' wood fence;
Provide annual agreement for concrete repair.
Posted Date
Feb 12, 2025
Due Date
Mar 6, 2025
Release: Feb 12, 2025
Close: Mar 6, 2025
Provide annual agreement for concrete repair.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis