Discover Opportunities months before the RFP drops
Learn more →Drinking water sources is Mead Dam. Raw water from this reservoir is transmitted to the Water Filtration Plant (WFP) at the intersection of Route 3 and Hammond Lane about six miles away. There is presently only one water main that carries the water from Mead to a cross connection on Rand Hill Road just south of Route 3 in West Plattsburgh (WPCC). The cross connection has a series of valves and multiple pipes that transmit the raw water from this point to the WFP.
Posted Date
Dec 9, 2025
Due Date
Feb 5, 2026
Release: Dec 9, 2025
Close: Feb 5, 2026
Drinking water sources is Mead Dam. Raw water from this reservoir is transmitted to the Water Filtration Plant (WFP) at the intersection of Route 3 and Hammond Lane about six miles away. There is presently only one water main that carries the water from Mead to a cross connection on Rand Hill Road just south of Route 3 in West Plattsburgh (WPCC). The cross connection has a series of valves and multiple pipes that transmit the raw water from this point to the WFP.
AvailableThe project involves the installation and construction of a municipal drinking water production well and associated development and testing.
Posted Date
Oct 1, 2025
Due Date
Oct 30, 2025
Release: Oct 1, 2025
Close: Oct 30, 2025
The project involves the installation and construction of a municipal drinking water production well and associated development and testing.
Hybrid aerial truck with line service body.
Posted Date
Sep 23, 2025
Due Date
Oct 14, 2025
Release: Sep 23, 2025
Close: Oct 14, 2025
Hybrid aerial truck with line service body.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis