Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Drinking water sources is Mead Dam. Raw water from this reservoir is transmitted to the Water Filtration Plant (WFP) at the intersection of Route 3 and Hammond Lane about six miles away. There is presently only one water main that carries the water from Mead to a cross connection on Rand Hill Road just south of Route 3 in West Plattsburgh (WPCC). The cross connection has a series of valves and multiple pipes that transmit the raw water from this point to the WFP.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Work includes 1 LS task 4: downhole video camera surveys; 1 LS task 6: mechanical cleaning; 1 LS task 8: initial development by focused-intake pumping and swabbing; 1 LS task 9: initial development by airlifting and swabbing; 1 LS task 10: install test pump for well development and testing; 1 LS task 11: final well developnent; 1 LS task 12: well testing; 1 LS task 13: well disinfection.
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
Work includes 1 LS task 4: downhole video camera surveys; 1 LS task 6: mechanical cleaning; 1 LS task 8: initial development by focused-intake pumping and swabbing; 1 LS task 9: initial development by airlifting and swabbing; 1 LS task 10: install test pump for well development and testing; 1 LS task 11: final well developnent; 1 LS task 12: well testing; 1 LS task 13: well disinfection.
AvailableRedevelopment of Production Well 8-3 as per Technical Specifications, Pump Testing, and Reinstallation of Original Pumping Equipment. Development of Test Well TB-8-3R as per Technical Specifications and Pump Testing.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Redevelopment of Production Well 8-3 as per Technical Specifications, Pump Testing, and Reinstallation of Original Pumping Equipment. Development of Test Well TB-8-3R as per Technical Specifications and Pump Testing.
AvailableThe Township of Parsippany-Troy Hills seeks a contractor to redevelop Production Well 8-3 and to develop Test Well TB-8-3R, including pump testing and reinstallation of original pumping equipment in accordance with technical specifications. Bid documents are available from the Township Purchasing Office for a nonrefundable fee; bidders must comply with applicable New Jersey statutes and regulations. Sealed bids are due by 10:00 AM ET on January 6, 2026 at the Township Purchasing Office.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The Township of Parsippany-Troy Hills seeks a contractor to redevelop Production Well 8-3 and to develop Test Well TB-8-3R, including pump testing and reinstallation of original pumping equipment in accordance with technical specifications. Bid documents are available from the Township Purchasing Office for a nonrefundable fee; bidders must comply with applicable New Jersey statutes and regulations. Sealed bids are due by 10:00 AM ET on January 6, 2026 at the Township Purchasing Office.
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis