City of Plattsburgh
The project involves the installation and construction of a municipal drinking water production well and associated development and testing.
Metro Flood Diversion Authority
The project consists of constructing two (2) 12" potable water production wells, including well casings screens, and test pumping each well.
City of Lacey
Drilling to 500 FT and constructing, developing, and testing one 16" diameter production well. A surface seal will be installed at a depth of 38 feet. The final depth and completion of the production well will be confirmed based on observations during drilling and grain-size testing results. The production well will be constructed in one of two ways: 1) shallow completion with natural pack from approx. 255 to 310 FT; or 2) deep completion with engineered pack from approx. 400 to 490 FT.
City of Bristol
Work includes installation of a new deep-water production well with connection to the citys water system.
Release
Oct 01, 2025
Close
Oct 30, 2025