Discover Opportunities months before the RFP drops
Learn more →Street rehabilitation project including storm drainage and sanitary sewer system improvements. The work consists of roadway excavation, pavement grinding, grading, preparing sub-grade, placing salvaged asphaltic grindings for re-use as base material, placing Class 2 aggregate base and asphalt concrete paving for street reconstruction and overlay; construction and/or reconstruction of curb and gutter, cross gutter, sidewalk, driveway approaches and curb ramps; storm drain improvements; sanitary sewer improvements; raising/adjusting manholes, valve boxes, and utility boxes to new finished grade; traffic striping and markings and all other work.
Posted Date
Dec 6, 2025
Due Date
Jan 8, 2026
Release: Dec 6, 2025
Close: Jan 8, 2026
Street rehabilitation project including storm drainage and sanitary sewer system improvements. The work consists of roadway excavation, pavement grinding, grading, preparing sub-grade, placing salvaged asphaltic grindings for re-use as base material, placing Class 2 aggregate base and asphalt concrete paving for street reconstruction and overlay; construction and/or reconstruction of curb and gutter, cross gutter, sidewalk, driveway approaches and curb ramps; storm drain improvements; sanitary sewer improvements; raising/adjusting manholes, valve boxes, and utility boxes to new finished grade; traffic striping and markings and all other work.
AvailableThe work consists of roadway excavation, demo and removal of existing concrete, grading and subgrade preparation for construction and/or reconstruction of concrete curb and gutter, sidewalks, driveway approaches and curb ramps, including pavement conform strips and driveway transition areas. Miscellaneous work includes reconstructing a catch basin, adjusting existing utility boxes to new finished grade and all other work.
Posted Date
Dec 6, 2025
Due Date
Jan 8, 2026
Release: Dec 6, 2025
Close: Jan 8, 2026
The work consists of roadway excavation, demo and removal of existing concrete, grading and subgrade preparation for construction and/or reconstruction of concrete curb and gutter, sidewalks, driveway approaches and curb ramps, including pavement conform strips and driveway transition areas. Miscellaneous work includes reconstructing a catch basin, adjusting existing utility boxes to new finished grade and all other work.
AvailableSealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Sealed-bid public works construction for sidewalk and associated curb, gutter, driveway approaches, curb ramps, catch basin reconstruction and related roadway excavation, concrete removal, grading, subgrade preparation, pavement transitions and utility box adjustments along Prescott Lane.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis