Discover Opportunities months before the RFP drops
Learn more →For the services of a qualified Certified Public Accounting firm to conduct the Financial and Compliance Audit of the OURA's operations. Services will include, but not limited to: Planning and performing the audit; Performing tests of documentary evidence; Evaluation of internal controls; Review of Management Letter; Draft and final Audit Report (includes approximately seven copies and an electronic copy); and Review of Year End Financial reports, if available.
Posted Date
Oct 31, 2025
Due Date
Dec 5, 2025
Release: Oct 31, 2025
Close: Dec 5, 2025
For the services of a qualified Certified Public Accounting firm to conduct the Financial and Compliance Audit of the OURA's operations. Services will include, but not limited to: Planning and performing the audit; Performing tests of documentary evidence; Evaluation of internal controls; Review of Management Letter; Draft and final Audit Report (includes approximately seven copies and an electronic copy); and Review of Year End Financial reports, if available.
Tree pruning, cutting, and chipping contract.
Posted Date
Sep 30, 2025
Due Date
Oct 16, 2025
Release: Sep 30, 2025
Close: Oct 16, 2025
Tree pruning, cutting, and chipping contract.
Work includes remove and replace existing vertical ladder from each level with an appropriate aluminum ladder installed; remove and replace the existing 2nd level platform, support beams and railing; remove and replace existing piping from the pumps to the isolation valve; remove and replace existing pump guiderails and install new guiderails per manufacturer recommendations to include check valves, isolation valves, relief valves and pump bases; remove existing float apparatus housings (2) and install new still well transducer level sensor (1).
Posted Date
Sep 24, 2025
Due Date
Nov 6, 2025
Release: Sep 24, 2025
Close: Nov 6, 2025
Work includes remove and replace existing vertical ladder from each level with an appropriate aluminum ladder installed; remove and replace the existing 2nd level platform, support beams and railing; remove and replace existing piping from the pumps to the isolation valve; remove and replace existing pump guiderails and install new guiderails per manufacturer recommendations to include check valves, isolation valves, relief valves and pump bases; remove existing float apparatus housings (2) and install new still well transducer level sensor (1).
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.