Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Oakley
The City of Oakley is soliciting sealed bids for fuel system improvements at Oakley Municipal Airport. The project includes removal of the existing underground AvGas tank, installation of a new 10,000‑gallon AvGas tank, a 5,000‑gallon Jet A tank with piping, and a new point‑of‑sale device. Bids are due by 2:00 PM on February 26, 2026 and must include a 5 % bid security.
Posted Date
-
Due Date
Feb 26, 2026
City of Oakley
Close: Feb 26, 2026
The City of Oakley is soliciting sealed bids for fuel system improvements at Oakley Municipal Airport. The project includes removal of the existing underground AvGas tank, installation of a new 10,000‑gallon AvGas tank, a 5,000‑gallon Jet A tank with piping, and a new point‑of‑sale device. Bids are due by 2:00 PM on February 26, 2026 and must include a 5 % bid security.
City of Oakley
Work includes furnishing all the labor, materials, and equipment for construction of a new water treatment plant. Work in general includes: piping, fire hydrants, meters, valves, and appurtenances, site earthwork and compaction, waste holding pond and appurtenances, electrical, treatment equipment purchase and installation, water treatment equipment, pumps, chemical feed equipment, pre-engineered steel building, concrete, masonry, and architectural work, mechanical work and equipment, miscellaneous metal equipment, potable water tank and equipment, nitrate waste tank and equipment, gravel drive and entrance work, telemetry system, and all other incidental and appurtenant work.
Posted Date
Feb 4, 2026
Due Date
Mar 3, 2026
Release: Feb 4, 2026
City of Oakley
Close: Mar 3, 2026
Work includes furnishing all the labor, materials, and equipment for construction of a new water treatment plant. Work in general includes: piping, fire hydrants, meters, valves, and appurtenances, site earthwork and compaction, waste holding pond and appurtenances, electrical, treatment equipment purchase and installation, water treatment equipment, pumps, chemical feed equipment, pre-engineered steel building, concrete, masonry, and architectural work, mechanical work and equipment, miscellaneous metal equipment, potable water tank and equipment, nitrate waste tank and equipment, gravel drive and entrance work, telemetry system, and all other incidental and appurtenant work.
City of Oakley
Work includes furnishing all the labor, materials, and equipment for construction of approx 13,110 LF of 4"6"& 8" water line by directional drill and open trench , valves and appurtenances, excavation, backfilling, grading, gravel surfacing, concrete pavement, grass seeding, erosion control, and all other incidental and appurtenant work.
Posted Date
-
Due Date
Mar 3, 2026
City of Oakley
Close: Mar 3, 2026
Work includes furnishing all the labor, materials, and equipment for construction of approx 13,110 LF of 4"6"& 8" water line by directional drill and open trench , valves and appurtenances, excavation, backfilling, grading, gravel surfacing, concrete pavement, grass seeding, erosion control, and all other incidental and appurtenant work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Sole source: Do not pursue; pivot to professional services direct engagement or formal bid.
Coops: Buyer hasn’t historically used coops/resellers, but you can encourage them to explore these procurement programs and these resellers as future options.
City of Oakley, KS: No evidence of sole-source contracting. Deprioritize this path.
Track City of Oakley's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database