Discover Opportunities months before the RFP drops
Learn more →Replace our existing end of-life (EOL) VOIP platform.
Posted Date
Nov 30, 2025
Due Date
Dec 29, 2025
Release: Nov 30, 2025
Close: Dec 29, 2025
Replace our existing end of-life (EOL) VOIP platform.
AvailableWork consists of a new stormwater pump station c-14 stormwater pump station.
Posted Date
Nov 16, 2025
Due Date
Jan 8, 2026
Release: Nov 16, 2025
Close: Jan 8, 2026
Work consists of a new stormwater pump station c-14 stormwater pump station.
AvailableWork includes install two (2) backflow control valves to prevent stormwater backflow into the citys drainage system during periods of high-water flow from the adjacent c-14 canal. In addition, the project involves dredging of accumulated sediment to restore channel capacity, stabilization of embankments to prevent erosion and maintain structural integrity, and the rehabilitation of existing culverts through the installation of high-density polyethylene (hdpe) liners.
Posted Date
Sep 28, 2025
Due Date
Nov 6, 2025
Release: Sep 28, 2025
Close: Nov 6, 2025
Work includes install two (2) backflow control valves to prevent stormwater backflow into the citys drainage system during periods of high-water flow from the adjacent c-14 canal. In addition, the project involves dredging of accumulated sediment to restore channel capacity, stabilization of embankments to prevent erosion and maintain structural integrity, and the rehabilitation of existing culverts through the installation of high-density polyethylene (hdpe) liners.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis