Discover Opportunities months before the RFP drops
Learn more →Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableWork includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
Posted Date
Nov 19, 2025
Due Date
Jan 9, 2026
Release: Nov 19, 2025
Close: Jan 9, 2026
Work includes construction of a 0.75 MG elevated water storage tank of the spheroid design; site improvements including: elevated storage tank; tank foundation; buried and above grade piping and valves; entrance driveway; site grading; retaining wall; structural work; electrical work; instrumentation and SCADA integration.
AvailableWork inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
Posted Date
Nov 17, 2025
Due Date
Jan 9, 2026
Release: Nov 17, 2025
Close: Jan 9, 2026
Work inlcudes 6", 16", 18", and 24" DIP water main installed by open cut and horizontal directional bore construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection. See outside link.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis