Discover Opportunities months before the RFP drops
Learn more →Procurement of renovation services for the Olan Thomas Warehouse.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Procurement of renovation services for the Olan Thomas Warehouse.
AvailableThe work includes, but is not limited to, removal and disposal of the existing perimeter fencing at the Park Warehouse and replacement with new 8-foot-high vinyl coated chain-link fencing with slats for privacy screening, topped with barbed wire; an automated 12'-wide sliding gate at entrance; and a new 25' X 30-foot carport structure with LED lighting under; and building repairs including roof coating, exterior wall panel replacement, lighting replacement, and other internal and external repairs and building modifications.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
The work includes, but is not limited to, removal and disposal of the existing perimeter fencing at the Park Warehouse and replacement with new 8-foot-high vinyl coated chain-link fencing with slats for privacy screening, topped with barbed wire; an automated 12'-wide sliding gate at entrance; and a new 25' X 30-foot carport structure with LED lighting under; and building repairs including roof coating, exterior wall panel replacement, lighting replacement, and other internal and external repairs and building modifications.
AvailableThe george wilson center improvements project includes, but is not limited to, site and facility accessibility improvements and the selective demolition, renovation, and new construction within the existing building. The scope includes removal and installation of new finishes and fixtures, enlargement of an existing room using non-structural partitions, and complete renovation of existing toilet rooms, including correction of floor slab elevations, installation of new plumbing fixtures, the addition of one all-gender restroom, and accessory upgrades. The correction of floor slab elevations at existing toilet rooms includes correcting existing and new slab elevations to achieve proper slope and drain connections. General building improvements including flooring replacement, interior finishes replacement, and exterior finishes replacement as shown on the attached drawings. Plumbing, electric, and hvac improvements are required for improvements and include, but not limited to, upgrades to existing lighting, replacement of plumbing fixtures, relocation of existing hot water heaters, exhaust fan, and grease trap and new piping, venting, and insulation as required to ensure complete operational systems.
Posted Date
Oct 22, 2025
Due Date
Nov 18, 2025
Release: Oct 22, 2025
Close: Nov 18, 2025
The george wilson center improvements project includes, but is not limited to, site and facility accessibility improvements and the selective demolition, renovation, and new construction within the existing building. The scope includes removal and installation of new finishes and fixtures, enlargement of an existing room using non-structural partitions, and complete renovation of existing toilet rooms, including correction of floor slab elevations, installation of new plumbing fixtures, the addition of one all-gender restroom, and accessory upgrades. The correction of floor slab elevations at existing toilet rooms includes correcting existing and new slab elevations to achieve proper slope and drain connections. General building improvements including flooring replacement, interior finishes replacement, and exterior finishes replacement as shown on the attached drawings. Plumbing, electric, and hvac improvements are required for improvements and include, but not limited to, upgrades to existing lighting, replacement of plumbing fixtures, relocation of existing hot water heaters, exhaust fan, and grease trap and new piping, venting, and insulation as required to ensure complete operational systems.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis