Discover Opportunities months before the RFP drops
Learn more →Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
Posted Date
Nov 17, 2025
Due Date
Dec 23, 2025
Release: Nov 17, 2025
Close: Dec 23, 2025
Work includes removal and replacement of curb, gutter, sidewalk, and drive approaches; tree root removal; removal and replacement of ada pedestrian curb ramps; cold planing; full pavement reconstruction/regrading; adjustment of water valve covers to grade; adjustment of sewer manholes and cleanouts to grade; road culvert drainage system; traffic signing, striping and stenciling; street lighting; landscape and irrigation; and street sweeping.
AvailableProject consist of demolition and removal of existing handrails and construction of new handrails along the bridge.
Posted Date
Feb 3, 2025
Due Date
Feb 20, 2025
Release: Feb 3, 2025
Close: Feb 20, 2025
Project consist of demolition and removal of existing handrails and construction of new handrails along the bridge.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis