Discover Opportunities months before the RFP drops
Learn more →Work includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Work includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
AvailableWork includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Work includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
AvailableProcurement of paving work, including construction of asphaltic concrete pavement, concrete walk, curb and gutter, pavement grinding, plastic pavement markings, manhole/inlet adjustments, CUC adjustments, pinned-on concrete traffic islands, and bioswales in specified locations on E. Corcoran Ave. and N. Jefferson St.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Procurement of paving work, including construction of asphaltic concrete pavement, concrete walk, curb and gutter, pavement grinding, plastic pavement markings, manhole/inlet adjustments, CUC adjustments, pinned-on concrete traffic islands, and bioswales in specified locations on E. Corcoran Ave. and N. Jefferson St.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis