Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Premium
Access the largest public sector contact database
Work includes 19 hydrant install hydrant; 1 valve install cut-in 16" valve; 36 LF furnish and install copper water service (type "k") private side; 10 LF copper internal plumbing piping; 373 CY aggregate slurry backfill; 5 EA tree removal; 2060 SY permanent pavement - 4" asphaltic concrete; 203 LF concrete curb & gutter; 3,720 SF concrete walk; 60 SF driveway - concrete; 5,070 LF sawcutting - asphalt; 3,025 sawcutting - concrete (full depth); 145 LF driveway - asphalt; 1 LS furnish, install, and maintain erosion control.
The Work shall include: Hydro-excavation of approx. 460 water service lines on street side and property side (defined in relation to the right-of-way line) to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 545 total replacements are anticipated. Water service line replacements will consist of connecting to the existing water main, installation of water service line tubing, installation of curb stops, boxes, and lids, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
The Work shall include: Hydro-excavation of approx. 460 water service lines on street side and property side (defined in relation to the right-of-way line) to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 545 total replacements are anticipated. Water service line replacements will consist of connecting to the existing water main, installation of water service line tubing, installation of curb stops, boxes, and lids, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
AvailableThe Work shall include: Hydro-excavation of approx. 430 Utility-side water service lines and approx. 430 Customer-side water service lines to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 475 utility-side, customer-side, or full water service line replacements are anticipated. Replacement will consist of connecting to the existing water main, installation of service line on the utility-side, customer-side, or both, new meter pits, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
The Work shall include: Hydro-excavation of approx. 430 Utility-side water service lines and approx. 430 Customer-side water service lines to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 475 utility-side, customer-side, or full water service line replacements are anticipated. Replacement will consist of connecting to the existing water main, installation of service line on the utility-side, customer-side, or both, new meter pits, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
AvailableProject scope is the full replacement of lead service lines from the water main through to the interior of the building or from the existing b-box, including connection to the water meter as identified. Work includes complete connection of the new service line, disconnection of the old lead service line and associated site restoration.
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
Project scope is the full replacement of lead service lines from the water main through to the interior of the building or from the existing b-box, including connection to the water meter as identified. Work includes complete connection of the new service line, disconnection of the old lead service line and associated site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis