Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Marion
The City of Marion is soliciting proposals from qualified Design-Build firms to provide professional design and construction services for a new public works maintenance garage building. The project is intended to supplement the existing municipal facility, which currently lacks sufficient space to accommodate larger vehicles and equipment.
Posted Date
May 27, 2026
Due Date
Jul 27, 2026
Release: May 27, 2026
City of Marion
Close: Jul 27, 2026
The City of Marion is soliciting proposals from qualified Design-Build firms to provide professional design and construction services for a new public works maintenance garage building. The project is intended to supplement the existing municipal facility, which currently lacks sufficient space to accommodate larger vehicles and equipment.
AvailableCity of Marion
Work consists of remove one unused steel roof top vent in the northeast corner below roof line and fill in opening with 2' x 4' frame and covered with cdx plywood; remove and dispose of existing metal counter flashing on vertical walls; furnish and install 1/2" wood blocking along gutter edge; slice existing rubber membrane on 10' center, per roofing manufacturers specifications; furnish and install (1) layer of 1/2" high density cover board roof insulation mechanically fastened to the wood deck.
Posted Date
Feb 26, 2026
Due Date
Mar 5, 2026
Release: Feb 26, 2026
City of Marion
Close: Mar 5, 2026
Work consists of remove one unused steel roof top vent in the northeast corner below roof line and fill in opening with 2' x 4' frame and covered with cdx plywood; remove and dispose of existing metal counter flashing on vertical walls; furnish and install 1/2" wood blocking along gutter edge; slice existing rubber membrane on 10' center, per roofing manufacturers specifications; furnish and install (1) layer of 1/2" high density cover board roof insulation mechanically fastened to the wood deck.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Marion
This document outlines the comprehensive plan for the City of Marion. It serves as a foundational guide for the city's long-term development, land use, infrastructure, and community goals, reflecting the adopted and final version as of its completion date.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Marion's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge