Learn more →Procurement of a General Contractor for Phase 2 expansion of Lake Wales Memorial Gardens, including construction of roadways, curbs, sidewalks, stormwater systems, and a scattered garden.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
Procurement of a General Contractor for Phase 2 expansion of Lake Wales Memorial Gardens, including construction of roadways, curbs, sidewalks, stormwater systems, and a scattered garden.
Work includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
Work includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
Work includes construction temporary entrance and installation of erosion control measures, strip & stockpile the site to construct the project, construction of pavement and flush ribbon curbs, construction of stormwater pond and permanent concrete weir, construction of sidewalk for scattered garden, installation of scattered garden monument, installation of flagpole and security camera, installation of irrigation system, installation of landscape and grass seeding & sodding.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
Work includes construction temporary entrance and installation of erosion control measures, strip & stockpile the site to construct the project, construction of pavement and flush ribbon curbs, construction of stormwater pond and permanent concrete weir, construction of sidewalk for scattered garden, installation of scattered garden monument, installation of flagpole and security camera, installation of irrigation system, installation of landscape and grass seeding & sodding.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis