Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Lake Wales
Work includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Trinity River Authority
Provide stilling basin improvements, phase ii.
Posted Date
Nov 17, 2025
Due Date
Dec 5, 2025
Release: Nov 17, 2025
Trinity River Authority
Close: Dec 5, 2025
Provide stilling basin improvements, phase ii.
AvailableCity of Missoula
All demolition, site work, and restoration; and more specifically includes installing 3140 LF of curb, 27,980 SF of concrete and sidewalk, and 1,130 SY of asphalt patch. Additionally, this project has a bid alternative that would include full re-paving of Street in the project area, which would include additional asphalt demolition and 10,514 SY of new asphalt.
Posted Date
Nov 7, 2025
Due Date
Nov 25, 2025
Release: Nov 7, 2025
City of Missoula
Close: Nov 25, 2025
All demolition, site work, and restoration; and more specifically includes installing 3140 LF of curb, 27,980 SF of concrete and sidewalk, and 1,130 SY of asphalt patch. Additionally, this project has a bid alternative that would include full re-paving of Street in the project area, which would include additional asphalt demolition and 10,514 SY of new asphalt.
AvailableTown of Hoffman
Work includes approx. 1,525 LF of 8" SDR 26 PVC sewer line, 0'-8' depth; 1,220 LF of 8" SDR 26 PVC sewer line, 8'-12' depth; 285 EA of 24"x0.375" steel casing bored and jacked w/ carrier pipe beneath railroad and US-1; 1,650 LF of 4" SDR 21 PVC force main; 1,400 LF of 4" sch. 40 gravity service lateral pipe (LMI); 2,300 LF of silt fence; 2,800 SY of temporary matting; see outside link for more details.
Posted Date
Oct 23, 2025
Due Date
Nov 21, 2025
Release: Oct 23, 2025
Town of Hoffman
Close: Nov 21, 2025
Work includes approx. 1,525 LF of 8" SDR 26 PVC sewer line, 0'-8' depth; 1,220 LF of 8" SDR 26 PVC sewer line, 8'-12' depth; 285 EA of 24"x0.375" steel casing bored and jacked w/ carrier pipe beneath railroad and US-1; 1,650 LF of 4" SDR 21 PVC force main; 1,400 LF of 4" sch. 40 gravity service lateral pipe (LMI); 2,300 LF of silt fence; 2,800 SY of temporary matting; see outside link for more details.
City of Wichita
Work includes sidewalk improvements. Seeding; site clearing; site restoration; 32 lf pipe, pvc 8"; 8,153 sf concrete sidewalk 4"; 46 sy rip-rap, light stone; bmp, construction entrance; 121 sy rip-rap, floodway heavy stone; 24 lf pipe, sws, rcbc (12' x 3'); 2 ea precast rcbc end sections (12' x 3').
Posted Date
Nov 7, 2025
Due Date
Nov 21, 2025
Release: Nov 7, 2025
City of Wichita
Close: Nov 21, 2025
Work includes sidewalk improvements. Seeding; site clearing; site restoration; 32 lf pipe, pvc 8"; 8,153 sf concrete sidewalk 4"; 46 sy rip-rap, light stone; bmp, construction entrance; 121 sy rip-rap, floodway heavy stone; 24 lf pipe, sws, rcbc (12' x 3'); 2 ea precast rcbc end sections (12' x 3').
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis