Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Trinity River Authority
Provide stilling basin improvements, phase ii.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Trinity River Authority
Provision of professional consulting services in the range of primary and specialty category services that will be required.
Posted Date
Nov 11, 2025
Due Date
Dec 5, 2025
Release: Nov 11, 2025
Trinity River Authority
Close: Dec 5, 2025
Provision of professional consulting services in the range of primary and specialty category services that will be required.
AvailableCity of Fort Wayne
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
City of Fort Wayne
Close: Dec 18, 2025
Water pollution control plant aeration basin diffuser improvements phase 2 as follows: the work of this contract contains upgrades to the west aeration basin complex and is generally described as follows: upgrades to the aeration diffusers and low pressure piping feeding aeration basin 7, 8, and 9; owner to furnish aeration diffusers and flow control valves. Design of pipe support and thermal expansion system. Additional upgrades of wastewater treatment facilities including structural, electrical, and instrumentation and control.
AvailableCity of Lake Wales
Work includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
City of Lake Wales
Close: Dec 19, 2025
Work includes 1,35 square yards demolition of existing concrete, 8 each inlet protection systems, 8 each mailbox relocations, lump sum tree/shrub removal, 14 each manhole/cleanout. Adjust valve boxes, rims, lids, 1,120 linear feet concrete curb and gutter, 2650 square yards of 4concrete sidewalk, 900 square yards of 6 sidewalks and driveways, 300 square feet of detectable warning surfaces, 2000 square yards of performance turf sod along the edge of the sidewalk, 6 each sign, posts relocate, 1950 linear feet of thermo, std, white, 12 striping for crosswalks, 40 linear feet of thermo, std, white, solid, 24 striping for stop bars, and other associated miscellaneous items.
AvailableCity of Naperville
The City of Naperville is soliciting bids for the 2026 Ogden Avenue Phase II Water Main Improvements involving installation of new water mains and replacement of existing mains. A non-mandatory virtual pre-bid meeting is scheduled for 2025-12-02 and bids are due on 2025-12-18.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
City of Naperville
Close: Dec 18, 2025
The City of Naperville is soliciting bids for the 2026 Ogden Avenue Phase II Water Main Improvements involving installation of new water mains and replacement of existing mains. A non-mandatory virtual pre-bid meeting is scheduled for 2025-12-02 and bids are due on 2025-12-18.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis