Discover Opportunities months before the RFP drops
Learn more →Scope of work: Construction of approx 1,700 LF of concrete sidewalk and curb along Carman Drive, including four concrete curb ramps and the reconstruction of nine driveways. In addition, the project includes a new large flow-through stormwater planter and seven streetlights with poles. Another major component is a 100-foot-long retaining wall up to six feet tall. The work also includes tree removal, relocation of water meters, underground utilities, and the addition of a new catch basin and storm pipe.
Posted Date
Dec 3, 2025
Due Date
Dec 23, 2025
Release: Dec 3, 2025
Close: Dec 23, 2025
Scope of work: Construction of approx 1,700 LF of concrete sidewalk and curb along Carman Drive, including four concrete curb ramps and the reconstruction of nine driveways. In addition, the project includes a new large flow-through stormwater planter and seven streetlights with poles. Another major component is a 100-foot-long retaining wall up to six feet tall. The work also includes tree removal, relocation of water meters, underground utilities, and the addition of a new catch basin and storm pipe.
AvailableAbandon and remove foundation and site piping, and replace existing pump station. Upgrade water systems including: Abandon a section of existing water distribution system; construct approx 200’ of new water distribution pipelines; install two isolation valves; construct a new distribution pump station with new electrical, pumping equipment, standby gas generator, and all other equipment; construct site improvements including masonry pavers and landscaping; and provide on-site stormwater management, facility startup, and testing.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Abandon and remove foundation and site piping, and replace existing pump station. Upgrade water systems including: Abandon a section of existing water distribution system; construct approx 200’ of new water distribution pipelines; install two isolation valves; construct a new distribution pump station with new electrical, pumping equipment, standby gas generator, and all other equipment; construct site improvements including masonry pavers and landscaping; and provide on-site stormwater management, facility startup, and testing.
AvailableProvide investment management and fiduciary services.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Provide investment management and fiduciary services.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis