Discover Opportunities months before the RFP drops
Learn more →Construct a series of small-scale water and storm drainage improvements at five separate locations. The project's purpose is to replace aging or failing infrastructure, improve stormwater collection and conveyance, and restore pavement and landscaping disturbed by construction includes 133 LF remove & dispose existing 12" CMP SD pipe, 392 LF 12" storm drain pipe (PVC), 210 LF 8" PVC water line.
Posted Date
Nov 25, 2025
Due Date
Dec 9, 2025
Release: Nov 25, 2025
Close: Dec 9, 2025
Construct a series of small-scale water and storm drainage improvements at five separate locations. The project's purpose is to replace aging or failing infrastructure, improve stormwater collection and conveyance, and restore pavement and landscaping disturbed by construction includes 133 LF remove & dispose existing 12" CMP SD pipe, 392 LF 12" storm drain pipe (PVC), 210 LF 8" PVC water line.
Supply polyaluminum chloride, sodium hypochlorite, sodium permanganate, phosphoric acid, and sodium hydroxide.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Supply polyaluminum chloride, sodium hypochlorite, sodium permanganate, phosphoric acid, and sodium hydroxide.
AvailablePerform a city hall feasibility study, civic campus master planning, and existing city hall renovation analysis. Study will involve assessment of staffing needs, building size and configuration, design concepts, site requirements, construction costs and timelines to determine the optimal specification for a new city hall. Create a comprehensive master plan that addresses placement, expansion, parking landscaping, accessibility, connectivity, and integration with existing facilities. Assess the feasibility of two scenarios: Full modernization with system replacement and ADA upgrades to extend the facility's life; or minimal improvements focused on essential repairs to extend usability for about five years.
Posted Date
Oct 8, 2025
Due Date
Oct 29, 2025
Release: Oct 8, 2025
Close: Oct 29, 2025
Perform a city hall feasibility study, civic campus master planning, and existing city hall renovation analysis. Study will involve assessment of staffing needs, building size and configuration, design concepts, site requirements, construction costs and timelines to determine the optimal specification for a new city hall. Create a comprehensive master plan that addresses placement, expansion, parking landscaping, accessibility, connectivity, and integration with existing facilities. Assess the feasibility of two scenarios: Full modernization with system replacement and ADA upgrades to extend the facility's life; or minimal improvements focused on essential repairs to extend usability for about five years.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis