Learn more →Construction of 6,900 LF sanitary sewer, 1,550 LF water main, 1,030 LF storm sewer, 6500 SY 8" thick portland cement concrete pavement and work incidental.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
Construction of 6,900 LF sanitary sewer, 1,550 LF water main, 1,030 LF storm sewer, 6500 SY 8" thick portland cement concrete pavement and work incidental.
AvailableProvide reconfiguration of the intersection of avenue to include a southbound left-turn lane and new traffic signal. Removing existing pavement and mid-block crossing and placing 1,500 SY of 8" concrete pavement and 4,700 SF of concrete sidewalk. This project also consists of storm sewer improvements, traffic signal installation and associated electrical work, pavement striping and all other associated work. 1 LS mobilization; 1 LS traffic control; 1 LS erosion control; 1 LS earthwork; 1 EA potholing; 100 CY over excavation and replacement of unsuitable material (if required); 1069 LF remove 2' curb & gutter; 407 SY remove pavement; 4228 SF remove sidewalk; 1 LS remove pavement markings; 3 EA remove tree; 3 EA remove curb inlet; 1566 SY build 8" concrete pavement w/ integral curb. See attached file.
Posted Date
Nov 4, 2025
Due Date
Nov 18, 2025
Release: Nov 4, 2025
Close: Nov 18, 2025
Provide reconfiguration of the intersection of avenue to include a southbound left-turn lane and new traffic signal. Removing existing pavement and mid-block crossing and placing 1,500 SY of 8" concrete pavement and 4,700 SF of concrete sidewalk. This project also consists of storm sewer improvements, traffic signal installation and associated electrical work, pavement striping and all other associated work. 1 LS mobilization; 1 LS traffic control; 1 LS erosion control; 1 LS earthwork; 1 EA potholing; 100 CY over excavation and replacement of unsuitable material (if required); 1069 LF remove 2' curb & gutter; 407 SY remove pavement; 4228 SF remove sidewalk; 1 LS remove pavement markings; 3 EA remove tree; 3 EA remove curb inlet; 1566 SY build 8" concrete pavement w/ integral curb. See attached file.
Provide reconstruction of concrete pavement on avenue a. Work includes removing existing pavement and placing approx., 6,300 SY of 8" concrete pavement and 6,500 SF of concrete sidewalk. This project also consists of storm sewer improvements, waterline connections and abandonments, pavement striping and all other associated work. 1 LS mobilization; 1 LS phase 1 traffic control; 1 LS phase 2 traffic control; 1 LS phase 3 traffic control; 1 LS phase 4 traffic control; 1 LS erosion control; 1 LS earthwork; 200 CY overexcavation & replacement of unsuitable material (if required); 1 LS abandon water main; 1 EA remove tree; 1 EA remove curb inlet; 7 EA remove & salvage fire hydrant assembly; 7028 SY remove pavement; 6690 SF remove sidewalk; 24 LF grind curb. See attached file.
Posted Date
Nov 4, 2025
Due Date
Nov 18, 2025
Release: Nov 4, 2025
Close: Nov 18, 2025
Provide reconstruction of concrete pavement on avenue a. Work includes removing existing pavement and placing approx., 6,300 SY of 8" concrete pavement and 6,500 SF of concrete sidewalk. This project also consists of storm sewer improvements, waterline connections and abandonments, pavement striping and all other associated work. 1 LS mobilization; 1 LS phase 1 traffic control; 1 LS phase 2 traffic control; 1 LS phase 3 traffic control; 1 LS phase 4 traffic control; 1 LS erosion control; 1 LS earthwork; 200 CY overexcavation & replacement of unsuitable material (if required); 1 LS abandon water main; 1 EA remove tree; 1 EA remove curb inlet; 7 EA remove & salvage fire hydrant assembly; 7028 SY remove pavement; 6690 SF remove sidewalk; 24 LF grind curb. See attached file.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis