Sidewalk rehabilitation.
Available2025 water treatment plant clarifier metal structures rehab and painting.
Posted Date
-
Due Date
Nov 25, 2025
Close: Nov 25, 2025
2025 water treatment plant clarifier metal structures rehab and painting.
Construction of 1,886 LF of new roadway with curbs and sidewalks, mass grading across the project site, 8" sanitary sewer main (including associated structures, laterals, etc.), rcp storm sewer of sizes varying from 15" to 42" and associated inlets, installation of required utility conduits (2" and 4"), installation of electric, gas and telecom road crossing conduit (comprised of 3-4" conduits and 1-8" conduits) meeting utility company standards.
Posted Date
Oct 21, 2025
Due Date
Nov 11, 2025
Release: Oct 21, 2025
Close: Nov 11, 2025
Construction of 1,886 LF of new roadway with curbs and sidewalks, mass grading across the project site, 8" sanitary sewer main (including associated structures, laterals, etc.), rcp storm sewer of sizes varying from 15" to 42" and associated inlets, installation of required utility conduits (2" and 4"), installation of electric, gas and telecom road crossing conduit (comprised of 3-4" conduits and 1-8" conduits) meeting utility company standards.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis