Discover Opportunities months before the RFP drops
Learn more →The City of Georgetown seeks qualified contractors to install, maintain, remove, and store commercial-grade mini Christmas light strands throughout designated areas of the downtown district to enhance the festive atmosphere. A mandatory site visit is scheduled for 2025-08-25, and bids are due on 2026-09-10 at 2:00 PM; procurement documentation is available via the buyer-managed posting linked from the aggregator.
Posted Date
Aug 13, 2025
Due Date
Sep 10, 2026
Release: Aug 13, 2025
Close: Sep 10, 2026
The City of Georgetown seeks qualified contractors to install, maintain, remove, and store commercial-grade mini Christmas light strands throughout designated areas of the downtown district to enhance the festive atmosphere. A mandatory site visit is scheduled for 2025-08-25, and bids are due on 2026-09-10 at 2:00 PM; procurement documentation is available via the buyer-managed posting linked from the aggregator.
AvailablePerform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
Posted Date
Oct 15, 2025
Due Date
Nov 5, 2025
Release: Oct 15, 2025
Close: Nov 5, 2025
Perform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
Infrastructure assessment of sewer pipelines and sanitary manholes. Pipelines can include pipes.
Posted Date
Oct 15, 2025
Due Date
Nov 7, 2025
Release: Oct 15, 2025
Close: Nov 7, 2025
Infrastructure assessment of sewer pipelines and sanitary manholes. Pipelines can include pipes.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis