City of Georgetown
Perform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
Phase II Sewer Manhole Rehabilitation and Sewer Line CIPP - RFB
zip
City of Windsor
Project includes sanitary sewer and manhole rehabilitation, involves sewer lining by curing in place pipe (cipp) lining and manhole rehabilitation. The bid for the cipp trunk sewer lining and manhole rehabilitation encompasses but not limited to approx. 6,200 LF of 8" sanitary sewers and 290 VF of manhole rehabilitation, mobilization, demobilization, cleaning, televising, bypass pumping, traffic control, point repairs, surface restoration, and incidentals.
Newport Mud
Provide sanitary sewer phase 8 manhole rehabilitation. In general, this work consists of: cleaning and preparing of sanitary sewer manholes prior to rehabilitation, including removing existing liners, debris, etc; repair of sanitary sewer manholes including cementitious lining, epoxy lining, removing and replacing frames and covers, raising sanitary sewer manholes, repair of bench and invert, and grouting exterior of manhole frames; bypass pumping, as directed by engineer, to properly rehabilitate any manholes where a flow through bridge or plug is not a viable option. The cost for flow through bridges or plugs shall be included in other work items. See outside link.
City of Monterey
Work includes 102 LF rehabilitate existing 8" sanitary sewer mainline by cipp method; 86 LF rehabilitate existing 10" sanitary sewer mainline by cipp method; 321 lf rehabilitate existing 18" sanitary sewer mainline by cipp method; 1,303 LF rehabilitate existing 20" sanitary sewer mainline by cipp method; 3 EA verify and robotically reinstate existing lateral with "top hat" connection for cipp; 1 EA robotically trim intruding lateral.