City of Monterey
Work includes 102 LF rehabilitate existing 8" sanitary sewer mainline by cipp method; 86 LF rehabilitate existing 10" sanitary sewer mainline by cipp method; 321 lf rehabilitate existing 18" sanitary sewer mainline by cipp method; 1,303 LF rehabilitate existing 20" sanitary sewer mainline by cipp method; 3 EA verify and robotically reinstate existing lateral with "top hat" connection for cipp; 1 EA robotically trim intruding lateral.
Sanitary Sewer System Rehabilitation Aguajito Sewer CIPP (33c1750)
zip
City of Georgetown
Perform cure in place pipe (cipp) and sanitary sewer manhole rehabilitation work. Bypass Pumping Operations of Existing Sanitary Sewer, 1,277 LF of Cured-in-Place Pipe 12-in Sewer (Manhole to Manhole), All Depths (ML-15, ML-16, ML-18, & ML-19); 813 LF of Cured-in-Place Pipe 15-in Sewer (Manhole to Manhole), All Depths (ML-5, ML-6); 2,090 LF of Sewer Cleaning/Silt Removal Prior to CCTV- Heavy Cleaning (All Diameters); 12 EA of Reconnect Active Sewer Laterals to CIPP Lined Pipe, All Sizes All Depths; 12 EA of Service Lateral CIPP End Seal; 19 EA of Furnish and Install Flexible Chimney Seal, 24"; 6 EA of Repairing and Rebuilding Brickwork for Inverts, Benches, Walls, and Chimneys in Manholes (1818,1829,1830,1834,1837, and 1839), 173 VF of Sewer Manhole Monolithic Lining, 4-FT Dia. Manhole.
City of Windsor
Project includes sanitary sewer and manhole rehabilitation, involves sewer lining by curing in place pipe (cipp) lining and manhole rehabilitation. The bid for the cipp trunk sewer lining and manhole rehabilitation encompasses but not limited to approx. 6,200 LF of 8" sanitary sewers and 290 VF of manhole rehabilitation, mobilization, demobilization, cleaning, televising, bypass pumping, traffic control, point repairs, surface restoration, and incidentals.
City of Katy
Project involves rehabilitation of approx. 1,300 LF of existing 15" through 18" sanitary sewer by cured-in-place pipe (CIPP) liner. The project includes manhole rehabilitation, service line reconnections, and all labor, materials, and equipment required to perform the work.
Release
Oct 29, 2025
Close
Nov 18, 2025