Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Fleming-Neon's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Fleming-Neon
The City of Fleming‑Neon is requesting bids to replace 358 residential grinder pumps and related appurtenances as part of its Sanitary Sewer Restoration Project. Bids are due at City Hall on February 16, 2026 at 2:00 PM local time, with a pre‑bid conference scheduled for February 6, 2026 at 11:00 AM. Bidding documents are available via the Lynn Imaging planroom, and the project is subject to Build America, Buy America requirements.
Posted Date
Jan 22, 2026
Due Date
Feb 16, 2026
Release: Jan 22, 2026
City of Fleming-Neon
Close: Feb 16, 2026
The City of Fleming‑Neon is requesting bids to replace 358 residential grinder pumps and related appurtenances as part of its Sanitary Sewer Restoration Project. Bids are due at City Hall on February 16, 2026 at 2:00 PM local time, with a pre‑bid conference scheduled for February 6, 2026 at 11:00 AM. Bidding documents are available via the Lynn Imaging planroom, and the project is subject to Build America, Buy America requirements.
AvailableCity of Fleming-Neon
Cable television system.
Posted Date
Oct 16, 2025
Due Date
Oct 21, 2025
Release: Oct 16, 2025
City of Fleming-Neon
Close: Oct 21, 2025
Cable television system.
City of Fleming-Neon
Work includes to reinforce four (4) manholes in the system. The mitigation measures will reduce the risk of future damage by minimizing potential displacement of the manhole during embankment erosion in extreme overland flooding. Project scope includes: install 6 LF of 72" culvert pipe. Install 2.2 CY (cubic area = 59.559 cubic feet) of concrete class b. 1 each of hc rebar individual highchair, 7-12 plastic tipped (case of 50) rebar mesh chair. Supports and concrete. Add 1 each of w830zpt di duoseal l8 assembly (manhole lid). Install 12.28 TN (11.18 ft x 10ft x 2ft) of cyclopean riprap.
Posted Date
Sep 17, 2025
Due Date
Sep 29, 2025
Release: Sep 17, 2025
City of Fleming-Neon
Close: Sep 29, 2025
Work includes to reinforce four (4) manholes in the system. The mitigation measures will reduce the risk of future damage by minimizing potential displacement of the manhole during embankment erosion in extreme overland flooding. Project scope includes: install 6 LF of 72" culvert pipe. Install 2.2 CY (cubic area = 59.559 cubic feet) of concrete class b. 1 each of hc rebar individual highchair, 7-12 plastic tipped (case of 50) rebar mesh chair. Supports and concrete. Add 1 each of w830zpt di duoseal l8 assembly (manhole lid). Install 12.28 TN (11.18 ft x 10ft x 2ft) of cyclopean riprap.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.