Discover Opportunities months before the RFP drops
Learn more →The City of Clemson is soliciting bids for the College Ave. Streetscape Improvements - Phase 1, a design-bid-build construction project in Clemson, SC. Bids are due December 12, 2025 with a scheduled bid opening at 2:00pm, and solicitation documents are available from the City of Clemson bid page linked on the posting.
Posted Date
Oct 29, 2025
Due Date
Dec 12, 2025
Release: Oct 29, 2025
Close: Dec 12, 2025
The City of Clemson is soliciting bids for the College Ave. Streetscape Improvements - Phase 1, a design-bid-build construction project in Clemson, SC. Bids are due December 12, 2025 with a scheduled bid opening at 2:00pm, and solicitation documents are available from the City of Clemson bid page linked on the posting.
Provide consultation and recommendations for a Construction Manager at Risk (CMAR) consultation and pre-construction services for the City's Arts Center.
Posted Date
Nov 4, 2025
Due Date
Nov 21, 2025
Release: Nov 4, 2025
Close: Nov 21, 2025
Provide consultation and recommendations for a Construction Manager at Risk (CMAR) consultation and pre-construction services for the City's Arts Center.
Work includes 16,291 SF asphalt mill and resurface; 14,094 SF asphalt demolition; 1,754 LF curb and gutter demolition; 15,750 SF brick paver demolition; 17,900 SF concrete sidewalk; 8,635 SF heavy duty concrete pavement; 2,181 SF concrete stamping; 1,448 LF 18" concrete curb and gutter; 2 EA. ADA ramp; 495 LF thermoplastic striping (double striping); 150 LF electrical conduit; 1,169 LF fiber conduit; 8 EA. catenary lighting mount; 8 LF handrail; 435 LF 15" HP storm pipe; 140 LF 6" DIP waterline.
Posted Date
Oct 29, 2025
Due Date
Dec 2, 2025
Release: Oct 29, 2025
Close: Dec 2, 2025
Work includes 16,291 SF asphalt mill and resurface; 14,094 SF asphalt demolition; 1,754 LF curb and gutter demolition; 15,750 SF brick paver demolition; 17,900 SF concrete sidewalk; 8,635 SF heavy duty concrete pavement; 2,181 SF concrete stamping; 1,448 LF 18" concrete curb and gutter; 2 EA. ADA ramp; 495 LF thermoplastic striping (double striping); 150 LF electrical conduit; 1,169 LF fiber conduit; 8 EA. catenary lighting mount; 8 LF handrail; 435 LF 15" HP storm pipe; 140 LF 6" DIP waterline.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis